First experiences with the new Pilot-Tone-based eBPM system in Elettra Storage Ring

This paper presents the first experiences acquired with the new eBPM system based on pilot tone compensation, developed for Elettra 2.0. After the successful delivery of seven complete systems, belonging to a pre-series production within the signed partnership with Instrumentation Technologies, we started their integration in the current machine, in order to gain experience and develop all the functionalities required for the future commissioning of the new accelerator, scheduled for 2026. To do so, an entire section of Elettra storage ring has been equipped with the new systems: eight Libera Electron units have been replaced by eight Pilot Tone Front End (PTFE) and four digital platforms (DAQ10SX). Tests were carried out during dedicated machine shifts, focusing on integration with the new global orbit feedback at different data rates (10 kHz, 100 kHz and turn-by-turn), with and without pilot tone compensation. Nevertheless, triggered acquisitions were made in order to test first turn capability of the system. Another unit has been attached to a pair of spare pick-ups (low-gap BPMs), in order to continue the development of new features and to provide different types of data (raw ADC data, turn-by-turn calculated positions, etc.) for machine physics studies, even during user-dedicated shifts.

Publication Details

Journal
JACOW
Published
2024-12-18
DOI
https://doi.org/10.18429/jacow-ibic2024-tup31
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

First experiences with the new Pilot-Tone-based eBPM system in Elettra Storage Ring

JACOW
Particle Accelerators and Free-Electron Lasers
article

First experiences with the new Pilot-Tone-based eBPM system in Elettra Storage Ring

article en

Abstract

This paper presents the first experiences acquired with the new eBPM system based on pilot tone compensation, developed for Elettra 2.0. After the successful delivery of seven complete systems, belonging to a pre-series production within the signed partnership with Instrumentation Technologies, we started their integration in the current machine, in order to gain experience and develop all the functionalities required for the future commissioning of the new accelerator, scheduled for 2026. To do so, an entire section of Elettra storage ring has been equipped with the new systems: eight Libera Electron units have been replaced by eight Pilot Tone Front End (PTFE) and four digital platforms (DAQ10SX). Tests were carried out during dedicated machine shifts, focusing on integration with the new global orbit feedback at different data rates (10 kHz, 100 kHz and turn-by-turn), with and without pilot tone compensation. Nevertheless, triggered acquisitions were made in order to test first turn capability of the system. Another unit has been attached to a pair of spare pick-ups (low-gap BPMs), in order to continue the development of new features and to provide different types of data (raw ADC data, turn-by-turn calculated positions, etc.) for machine physics studies, even during user-dedicated shifts.

JACOW
Partnerships for the goals
Openalex Percentile: Top 67%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.