Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis

[Objective] The high reliability of urban rail transit system equipment is the cornerstone and guarantee for maintaining the safe and stable operation. Due to the rapid increase in operating mileage and the continuous expansion of network line capacity in recent years, the operational risks of urban rail transit are increasing every day, and the impact of reliability on safety risks is receiving increasing attention from the industry. [Method] Based on the impact of lifecycle events on reliability, urban rail transit equipment is divided into lifecycle stages (operation and maintenance phase). According to historical failure data, a data statistical model assisted by a mechanism model is established, and relevant reliability indicators are characterized through Minitab software. Based on the risk matrix method, the mapping relationship between reliability and lifecycle stages is characterized, and an equipment risk assessment model considering lifecycle stages is established. [Result & Conclusion] Taking the vehicle bogie wheelset axle box assembly as a case study, according to the vehicle specialized maintenance content and cycle requirements, the daily operation stages are categorized into four periods: stable operation, early failure, late failure, and replacement; the failure interval time is tested for fitting, and the three-parameter Weibull distribution is selected to represent its reliability characteristic function; each phase is mapped and assigned values through the reliability characteristic function. Based on the risk matrix method, the risk assessment levels of the vehicle bogie wheelset axle box assembly at each stage are obtained, and then the risk assessment results for each stage are output respectively. Risk levels for each stage are marked as R5, R3, R1, and R1.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-04-01
DOI
https://doi.org/10.16037/j.1007-869x.2025.04.012
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis

SHILAP Revista de lepidopterología
Reliability and Maintenance Optimization
article

Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis

article en

Abstract

[Objective] The high reliability of urban rail transit system equipment is the cornerstone and guarantee for maintaining the safe and stable operation. Due to the rapid increase in operating mileage and the continuous expansion of network line capacity in recent years, the operational risks of urban rail transit are increasing every day, and the impact of reliability on safety risks is receiving increasing attention from the industry. [Method] Based on the impact of lifecycle events on reliability, urban rail transit equipment is divided into lifecycle stages (operation and maintenance phase). According to historical failure data, a data statistical model assisted by a mechanism model is established, and relevant reliability indicators are characterized through Minitab software. Based on the risk matrix method, the mapping relationship between reliability and lifecycle stages is characterized, and an equipment risk assessment model considering lifecycle stages is established. [Result & Conclusion] Taking the vehicle bogie wheelset axle box assembly as a case study, according to the vehicle specialized maintenance content and cycle requirements, the daily operation stages are categorized into four periods: stable operation, early failure, late failure, and replacement; the failure interval time is tested for fitting, and the three-parameter Weibull distribution is selected to represent its reliability characteristic function; each phase is mapped and assigned values through the reliability characteristic function. Based on the risk matrix method, the risk assessment levels of the vehicle bogie wheelset axle box assembly at each stage are obtained, and then the risk assessment results for each stage are output respectively. Risk levels for each stage are marked as R5, R3, R1, and R1.

SHILAP Revista de lepidopterología
Shanghai University of Engineering Science (CN), Shanghai Urban Transportation Design Institute (China) (CN), Shanghai Tunnel Engineering Rail Transit Design & Research Institute (CN), China Railway Construction Corporation (China) (CN), China Railway Group (China) (CN)
Openalex Percentile: Top 48%
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis · SHILAP Revista de lepidopterología (2025) | TGRS Research Map | TGRS