Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation

Objective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within the fare-paid zone, resulting in a restriction of the operational capacity for both Line 3 and Line 11. To meet the urgent need for capacity enhancement, a renovation plan of the signaling system for Line 3 and Line 11 through train operation is required. Method The existing conditions and technical differences between the signaling systems of Line 3 and Line 11 are analyzed. Based on different wireless communication standards, a signaling system renovation plan is proposed to meet the requirements of the through train operation between two lines. The implementation plan for the signaling system renovation is designed according to the project preparation schedule for Line 3 and Line 11 signaling system upgrade, focusing on modifications of the on-board signaling subsystem, ATS (automatic train supervision) subsystem, mainline station signaling subsystem, and depot signaling subsystem. Result & Conclusion Through adaptive modifications to the signaling systems of Line 3 and Line 11, train cross-line driverless operation is achieved, the compatibility and interchangeability of on-board ATC (automatic train control) equipment, ATS servers, and workstation hardware are implemented, allowing for uninterrupted automatic switching of vehicle-wayside wireless communication. Trains can operate seamlessly across Line 3 and Line 11 in FAO (fully automatic operation) mode, enhancing the operational efficiency of urban rail transit and improving the passenger travel experience.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-10-01
DOI
https://doi.org/10.16037/j.1007-869x.2024.10.059
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation

SHILAP Revista de lepidopterología
Railway Systems and Energy Efficiency
article

Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation

article en

Abstract

Objective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within the fare-paid zone, resulting in a restriction of the operational capacity for both Line 3 and Line 11. To meet the urgent need for capacity enhancement, a renovation plan of the signaling system for Line 3 and Line 11 through train operation is required. Method The existing conditions and technical differences between the signaling systems of Line 3 and Line 11 are analyzed. Based on different wireless communication standards, a signaling system renovation plan is proposed to meet the requirements of the through train operation between two lines. The implementation plan for the signaling system renovation is designed according to the project preparation schedule for Line 3 and Line 11 signaling system upgrade, focusing on modifications of the on-board signaling subsystem, ATS (automatic train supervision) subsystem, mainline station signaling subsystem, and depot signaling subsystem. Result & Conclusion Through adaptive modifications to the signaling systems of Line 3 and Line 11, train cross-line driverless operation is achieved, the compatibility and interchangeability of on-board ATC (automatic train control) equipment, ATS servers, and workstation hardware are implemented, allowing for uninterrupted automatic switching of vehicle-wayside wireless communication. Trains can operate seamlessly across Line 3 and Line 11 in FAO (fully automatic operation) mode, enhancing the operational efficiency of urban rail transit and improving the passenger travel experience.

SHILAP Revista de lepidopterología
China Railway Fifth Survey and Design Institute Group (CN), Shanghai Tunnel Engineering Rail Transit Design & Research Institute (CN), China Railway Group (China) (CN)
Sustainable cities and communities
Openalex Percentile: Top 50%
Railway Systems and Energy Efficiency
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.