Incremental model updates in BIM: a critical analysis of the collaboration platform Speckle

Current practice and international standards implement BIM collaboration based on domain model federation, which leads to repetitive exchange of model versions as monolithic files. Subsequently, stakeholders receiving new model versions must manually check them to identify potential impacts on their own disciplines, which is labor-intensive and error-prone. These limitations can be overcome by implementing incremental update procedures. This way, only the information about the modified objects is transmitted in the event of model changes. In this paper, we examine the collaboration platform Speckle and critically assess its approach to implementing incremental model updates. Speckle provides an open and vendor-neutral data format and is known for its extensibility. We address several issues that were identified in Speckle's hierarchical data structure concerning the insertion and removal of model objects. An improved data structure inspired by Labeled Property Graphs will be presented, enabling more intuitive updates of BIM models and facilitating more accurate version control by maintaining object relationships.

Publication Details

Journal
tub.dok (Hamburg University of Technology)
Published
2024-09-18
DOI
https://doi.org/10.15480/882.13542
Citations
1
Primary Topic
Ethics in medical practice
Type
article
Field-Weighted Citation Impact
0.85
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Incremental model updates in BIM: a critical analysis of the collaboration platform Speckle

1 citations
tub.dok (Hamburg University of Technology)
Ethics in medical practice
0.85
article

Incremental model updates in BIM: a critical analysis of the collaboration platform Speckle

article en
1 citations

Abstract

Current practice and international standards implement BIM collaboration based on domain model federation, which leads to repetitive exchange of model versions as monolithic files. Subsequently, stakeholders receiving new model versions must manually check them to identify potential impacts on their own disciplines, which is labor-intensive and error-prone. These limitations can be overcome by implementing incremental update procedures. This way, only the information about the modified objects is transmitted in the event of model changes. In this paper, we examine the collaboration platform Speckle and critically assess its approach to implementing incremental model updates. Speckle provides an open and vendor-neutral data format and is known for its extensibility. We address several issues that were identified in Speckle's hierarchical data structure concerning the insertion and removal of model objects. An improved data structure inspired by Labeled Property Graphs will be presented, enabling more intuitive updates of BIM models and facilitating more accurate version control by maintaining object relationships.

tub.dok (Hamburg University of Technology)
Openalex Percentile: Top 18%
Ethics in medical practice
0.85
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Incremental model updates in BIM: a critical analysis of the collaboration platform Speckle · tub.dok (Hamburg University of Technology) (2024) | TGRS Research Map | TGRS