Bi-level optimal dispatching of low-carbon industrial park considering flexible shop scheduling in high-energy-consuming enterprise

Under the 'dual-carbon' goal, industrial parks, as the most important and extensive carriers of industrial systems, must undergo low-carbon transformation. In this context, this paper establishes a bi-level optimal dispatching model of low-carbon industrial park considering flexible scheduling of high-energy-consuming enterprises' production workshops. The model fully exploits the flexible adjustment ability of high-energy-consuming enterprises, obtains the optimal low-carbon scheduling plan of the park by flexibly adjusting the production scheme of high-energy-consuming enterprises to realize the coordinated operation of the industrial park and high-energy-consuming enterprises. Firstly, the upper layer establishes an optimal scheduling model with the objective of minimizing the total operating cost, taking into account carbon trading and tradable green certificate costs. Then, the lower layer focuses on the flexible scheduling problem of the high-energy-consuming enterprise's production workshops within the industrial park, aiming to minimize the maximum completion time and cost. The cost savings achieved by enterprise scheduling at the operational layer are used as subsidies. The upper and lower layers continuously coordinate and schedule plans to achieve the optimal objective. Finally, the feasibility and effectiveness of the proposed model are verified through case studies. The proposed approach not only reduces production costs and improves production efficiency but also effectively promotes load balancing, realizing the low-carbon operation of the industrial park.

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-09-01
DOI
https://doi.org/10.12158/j.2096-3203.2024.05.011
Primary Topic
Process Optimization and Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Bi-level optimal dispatching of low-carbon industrial park considering flexible shop scheduling in high-energy-consuming enterprise

SHILAP Revista de lepidopterología
Process Optimization and Integration
article

Bi-level optimal dispatching of low-carbon industrial park considering flexible shop scheduling in high-energy-consuming enterprise

article en

Abstract

Under the 'dual-carbon' goal, industrial parks, as the most important and extensive carriers of industrial systems, must undergo low-carbon transformation. In this context, this paper establishes a bi-level optimal dispatching model of low-carbon industrial park considering flexible scheduling of high-energy-consuming enterprises' production workshops. The model fully exploits the flexible adjustment ability of high-energy-consuming enterprises, obtains the optimal low-carbon scheduling plan of the park by flexibly adjusting the production scheme of high-energy-consuming enterprises to realize the coordinated operation of the industrial park and high-energy-consuming enterprises. Firstly, the upper layer establishes an optimal scheduling model with the objective of minimizing the total operating cost, taking into account carbon trading and tradable green certificate costs. Then, the lower layer focuses on the flexible scheduling problem of the high-energy-consuming enterprise's production workshops within the industrial park, aiming to minimize the maximum completion time and cost. The cost savings achieved by enterprise scheduling at the operational layer are used as subsidies. The upper and lower layers continuously coordinate and schedule plans to achieve the optimal objective. Finally, the feasibility and effectiveness of the proposed model are verified through case studies. The proposed approach not only reduces production costs and improves production efficiency but also effectively promotes load balancing, realizing the low-carbon operation of the industrial park.

SHILAP Revista de lepidopterología
Openalex Percentile: Top 57%
Process Optimization and Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Bi-level optimal dispatching of low-carbon industrial park considering flexible shop scheduling in high-energy-consuming enterprise · SHILAP Revista de lepidopterología (2024) | TGRS Research Map | TGRS