Quality assurance plan

This document represents the Quality Assurance Manual for the EU-SolarisERIC. The aim of this document is to describe the mechanisms to be usedwithin the ERIC to ensure the quality level of the KPIs and outcomesassociated with the operation of the European Research Infrastructure forConcentrated Solar Power (CSP) and Solar Thermal Energy (STE)

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-06-20
DOI
https://doi.org/10.5281/zenodo.15703698
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Quality assurance plan

Zenodo (CERN European Organization for Nuclear Research)
Integrated Energy Systems Optimization
article

Quality assurance plan

article en

Abstract

This document represents the Quality Assurance Manual for the EU-SolarisERIC. The aim of this document is to describe the mechanisms to be usedwithin the ERIC to ensure the quality level of the KPIs and outcomesassociated with the operation of the European Research Infrastructure forConcentrated Solar Power (CSP) and Solar Thermal Energy (STE)

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Openalex Percentile: Top 56%
Integrated Energy Systems Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Quality assurance plan · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS