EXCITATION SYSTEMS FORMOTOR-GENERATORS IN THEBAJINA BAŠTA PUMPED-STORAGEHYDROPOWER PLANT

The run-of-river hydropower plant HPP "Bajina Bašta" and the pumped-storagehydropower plant PSH "Bajina Bašta" in Perućac are the largest hydropower facilities built onthe Drina River. PSH "Bajina Bašta" is of great importance to Serbia's power system due to itsability to operate in both generating and pumping modes, thereby increasing the system'sflexibility in terms of managing production and consumption. Periods of lower electricityconsumption are used to fill the upper reservoir by operating the plant in pumping mode.When the system requires additional energy, the units switch to the opposite mode, and therelease of water from the higher-altitude reservoir drives the turbines, generating electricity.Also, due to its ability to start quickly and rapidly switch between generating and pumpingmodes, this plant can quickly respond to system disturbances and replace any other unit in theelectrical power system of Serbia. Therefore, the revitalization of PSH "Bajina Bašta," whichis expected to extend the lifespan of the units by several decades, is of great importance to thepower system. In 2024, the first unit was revitalized, while the revitalization of the secondunit is scheduled for 2025. Nikola Tesla Institute of Electrical Engineering participated in therevitalization by replacing the excitation systems. The power section of the excitation systemincludes high-performance components: excitation transformers, circuit breakers, thyristorbridges, demagnetization equipment, etc. The control section of the excitation system is basedon certified INTROL excitation regulators developed and manufactured at the Nikola TeslaInstitute. Within the regulators, sequential automatons are implemented for all operatingmodes of the units: generating mode, pumping mode, synchronous start, electric braking, andtesting. INTROL regulators enable various control modes: automatic stator voltage regulation,automatic reactive power regulation, and automatic power factor regulation, along withlimiter functions and a power system stabilizer. The thyristor bridges and excitation regulatorsare implemented redundantly in a 1+1 configuration. After installation and connection, theexcitation system was adjusted and tested, demonstrating good system performance, enablingreliable and stable unit operation in all operating modes, with automatic operation limitationwithin the boundaries defined by the operating diagram.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-05-29
DOI
https://doi.org/10.5281/zenodo.16025482
Primary Topic
Animal Behavior and Welfare Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

EXCITATION SYSTEMS FORMOTOR-GENERATORS IN THEBAJINA BAŠTA PUMPED-STORAGEHYDROPOWER PLANT

Zenodo (CERN European Organization for Nuclear Research)
Animal Behavior and Welfare Studies
article

EXCITATION SYSTEMS FORMOTOR-GENERATORS IN THEBAJINA BAŠTA PUMPED-STORAGEHYDROPOWER PLANT

article en

Abstract

The run-of-river hydropower plant HPP "Bajina Bašta" and the pumped-storagehydropower plant PSH "Bajina Bašta" in Perućac are the largest hydropower facilities built onthe Drina River. PSH "Bajina Bašta" is of great importance to Serbia's power system due to itsability to operate in both generating and pumping modes, thereby increasing the system'sflexibility in terms of managing production and consumption. Periods of lower electricityconsumption are used to fill the upper reservoir by operating the plant in pumping mode.When the system requires additional energy, the units switch to the opposite mode, and therelease of water from the higher-altitude reservoir drives the turbines, generating electricity.Also, due to its ability to start quickly and rapidly switch between generating and pumpingmodes, this plant can quickly respond to system disturbances and replace any other unit in theelectrical power system of Serbia. Therefore, the revitalization of PSH "Bajina Bašta," whichis expected to extend the lifespan of the units by several decades, is of great importance to thepower system. In 2024, the first unit was revitalized, while the revitalization of the secondunit is scheduled for 2025. Nikola Tesla Institute of Electrical Engineering participated in therevitalization by replacing the excitation systems. The power section of the excitation systemincludes high-performance components: excitation transformers, circuit breakers, thyristorbridges, demagnetization equipment, etc. The control section of the excitation system is basedon certified INTROL excitation regulators developed and manufactured at the Nikola TeslaInstitute. Within the regulators, sequential automatons are implemented for all operatingmodes of the units: generating mode, pumping mode, synchronous start, electric braking, andtesting. INTROL regulators enable various control modes: automatic stator voltage regulation,automatic reactive power regulation, and automatic power factor regulation, along withlimiter functions and a power system stabilizer. The thyristor bridges and excitation regulatorsare implemented redundantly in a 1+1 configuration. After installation and connection, theexcitation system was adjusted and tested, demonstrating good system performance, enablingreliable and stable unit operation in all operating modes, with automatic operation limitationwithin the boundaries defined by the operating diagram.

Zenodo (CERN European Organization for Nuclear Research)
Univerzitet Union Nikola Tesla (RS)
Openalex Percentile: Top 49%
Animal Behavior and Welfare Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.