HARNESSING AUTOMATION FOR EFFICIENT CONSTRUCTION MATERIAL MANAGEMENT

There is a limited understanding of automation in construction materials-handling processes utilized by manufacturing firms in Nigeria. This article evaluates the level of utilization of automation in construction materials-handling operations by manufacturing firms in North-Central Nigeria, to improve operational efficiency and reduce operating costs. Using a case study research design, quantitative data (observation guide with measurements) were collected from 32 purposively selected construction material manufacturers. A total of 72 customers’ orders were observed and recorded to be representative of deliveries from the sampled (n=32) manufacturers’ warehouses to other terminals. The descriptive method of data analysis was employed using percentages and results presented in a form of bar charts. The study reveals low-level utilization of automation in the combined processes of order picking, storage, loading, and offloading of material. These imply increasing material costs and causing a delay in delivery. The article concludes by providing construction-material manufacturers with areas that require automation to optimize material-handling Operations. A recommendation is made for further study to explore why automation is not utilized despite its advantage

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-06-02
DOI
https://doi.org/10.5281/zenodo.15574172
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

HARNESSING AUTOMATION FOR EFFICIENT CONSTRUCTION MATERIAL MANAGEMENT

Zenodo (CERN European Organization for Nuclear Research)
Advanced Manufacturing and Logistics Optimization
article

HARNESSING AUTOMATION FOR EFFICIENT CONSTRUCTION MATERIAL MANAGEMENT

article en

Abstract

There is a limited understanding of automation in construction materials-handling processes utilized by manufacturing firms in Nigeria. This article evaluates the level of utilization of automation in construction materials-handling operations by manufacturing firms in North-Central Nigeria, to improve operational efficiency and reduce operating costs. Using a case study research design, quantitative data (observation guide with measurements) were collected from 32 purposively selected construction material manufacturers. A total of 72 customers’ orders were observed and recorded to be representative of deliveries from the sampled (n=32) manufacturers’ warehouses to other terminals. The descriptive method of data analysis was employed using percentages and results presented in a form of bar charts. The study reveals low-level utilization of automation in the combined processes of order picking, storage, loading, and offloading of material. These imply increasing material costs and causing a delay in delivery. The article concludes by providing construction-material manufacturers with areas that require automation to optimize material-handling Operations. A recommendation is made for further study to explore why automation is not utilized despite its advantage

Zenodo (CERN European Organization for Nuclear Research)
Federal University of Technology Minna (NG)
Industry, innovation and infrastructure
Openalex Percentile: Top 45%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

HARNESSING AUTOMATION FOR EFFICIENT CONSTRUCTION MATERIAL MANAGEMENT · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS