Use of Building Information Modeling (BIM) to Improve Construction Management in the USA

The construction industry in the United States faces ongoing challenges related to cost overruns, project delays, and inefficiencies in project management. Building Information Modeling (BIM) has emerged as a transformative technology with the potential to address these issues by enhancing the precision, collaboration, and decision-making processes in construction management. This paper provides a comprehensive review of the application of BIM in the U.S. construction sector, with a focus on its impact on improving construction management practices. The review explores the specific ways in which BIM contributes to project success, including its ability to streamline workflows, reduce errors, and facilitate real-time collaboration among stakeholders. Through an in-depth analysis of current literature, this paper highlights the specialized functions of BIM that are particularly beneficial for construction management in the U.S., such as clash detection, 4D scheduling, and cost estimation. The paper also examines case studies that demonstrate the successful integration of BIM in large-scale projects across the country, showcasing tangible improvements in project outcomes, including reduced project timelines and enhanced cost efficiency. Additionally, the paper delves into the challenges associated with BIM adoption in the U.S., including the need for skilled personnel, the integration of BIM with existing project management systems, and the legal and contractual implications of BIM-based collaboration. These challenges are discussed alongside strategies for overcoming them, emphasizing the importance of training, standardization, and cross-disciplinary collaboration. The findings of this review suggest that the widespread adoption of BIM in the U.S. construction industry holds significant promise for enhancing project management efficiency, improving stakeholder communication, and ultimately contributing to more successful project outcomes. The paper concludes by proposing best practices for BIM implementation in construction management, aiming to guide industry professionals in leveraging this technology to its fullest potential.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-09-30
DOI
https://doi.org/10.5281/zenodo.14950289
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Use of Building Information Modeling (BIM) to Improve Construction Management in the USA

Zenodo (CERN European Organization for Nuclear Research)
BIM and Construction Integration
article

Use of Building Information Modeling (BIM) to Improve Construction Management in the USA

article en

Abstract

The construction industry in the United States faces ongoing challenges related to cost overruns, project delays, and inefficiencies in project management. Building Information Modeling (BIM) has emerged as a transformative technology with the potential to address these issues by enhancing the precision, collaboration, and decision-making processes in construction management. This paper provides a comprehensive review of the application of BIM in the U.S. construction sector, with a focus on its impact on improving construction management practices. The review explores the specific ways in which BIM contributes to project success, including its ability to streamline workflows, reduce errors, and facilitate real-time collaboration among stakeholders. Through an in-depth analysis of current literature, this paper highlights the specialized functions of BIM that are particularly beneficial for construction management in the U.S., such as clash detection, 4D scheduling, and cost estimation. The paper also examines case studies that demonstrate the successful integration of BIM in large-scale projects across the country, showcasing tangible improvements in project outcomes, including reduced project timelines and enhanced cost efficiency. Additionally, the paper delves into the challenges associated with BIM adoption in the U.S., including the need for skilled personnel, the integration of BIM with existing project management systems, and the legal and contractual implications of BIM-based collaboration. These challenges are discussed alongside strategies for overcoming them, emphasizing the importance of training, standardization, and cross-disciplinary collaboration. The findings of this review suggest that the widespread adoption of BIM in the U.S. construction industry holds significant promise for enhancing project management efficiency, improving stakeholder communication, and ultimately contributing to more successful project outcomes. The paper concludes by proposing best practices for BIM implementation in construction management, aiming to guide industry professionals in leveraging this technology to its fullest potential.

Zenodo (CERN European Organization for Nuclear Research)
Birmingham City University (GB), University of Johannesburg (ZA), University of North Dakota (US), Nasarawa State University (NG), National Universities Commission (NG)
Industry, innovation and infrastructure
Openalex Percentile: Top 63%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.