D5.1: Planning and setup handbook, and operational management report (1st version)

The purpose of this deliverable is to set up the procedures for the implementation of the six Use Cases (UCs), and a detailed testing and operational management plan for the validation procedures in the field trails, which will be continuously updated and reported at the end of each testing and validation phase. The deliverable will define the framework setup for the implementation of the UCs, during the planning phase. This includes defining baseline conditions, relevant assumptions, as well as quantifiable metrics and Key Performance Indicators (KPIs). Additionally, it encompasses the validation methodology, the planning and oversight of activities, and the ensuing learning process, all of which are accompanied by recommendations and best practices. These procedures were meticulously crafted and approved by all project partners before actual implementation to assess the feasibility and practicality of the UC validation and optimize their efficiency.

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-03-07
DOI
https://doi.org/10.5281/zenodo.14988942
Primary Topic
Water Quality and Resources Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

D5.1: Planning and setup handbook, and operational management report (1st version)

Zenodo (CERN European Organization for Nuclear Research)
Water Quality and Resources Studies
article

D5.1: Planning and setup handbook, and operational management report (1st version)

article en

Abstract

The purpose of this deliverable is to set up the procedures for the implementation of the six Use Cases (UCs), and a detailed testing and operational management plan for the validation procedures in the field trails, which will be continuously updated and reported at the end of each testing and validation phase. The deliverable will define the framework setup for the implementation of the UCs, during the planning phase. This includes defining baseline conditions, relevant assumptions, as well as quantifiable metrics and Key Performance Indicators (KPIs). Additionally, it encompasses the validation methodology, the planning and oversight of activities, and the ensuing learning process, all of which are accompanied by recommendations and best practices. These procedures were meticulously crafted and approved by all project partners before actual implementation to assess the feasibility and practicality of the UC validation and optimize their efficiency.

Zenodo (CERN European Organization for Nuclear Research)
Openalex Percentile: Top 60%
Water Quality and Resources Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.