The Dynamics of the Construction of the Jakarta-Yogyakarta Railroad throughthe Banyumas Karesidenan (1914-1917)

This research was conducted with the aim of complementing the study of the topic of the history of civil engineering technology from the colonial period which explains thedevelopment of rail-based transportation networks, as well as the trial and error of new technology trials at that time. In this research, it is expected to obtain a basic and detailed explanation of the planning, location determination, and construction process. In addition, the research that took place on the Cirebon-Kroya railway line concentrated on the Notog-Kebasen segment reviewed the development of the railway network in Java which was closely related to the transportation revolution in the application of new technology in Java, including the construction system of tunnels, roads, and bridges (mentioned as wisdom buildings), located in the Notog-Kebasen area. The explanation in this research is presented in a chronological, systematic, and qualitative analysis, to examine the topic of the history of civil engineering technology in the construction of the railroad network, including the wisdom building. The construction of the Cirebon-Kroya railway refers to the law of December 31, 1912 Stbl. 32/(1913), in which the 75 km Cirebon-Margasari section was opened on July 1, 1916, the 51 km Kroya-Margasari section was opened on July 1, 1916, and the 32 km Patuguran-Margasari section was opened on January 1, 1907.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-09-18
DOI
https://doi.org/10.5281/zenodo.13777965
Primary Topic
Architectural and Urban Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Dynamics of the Construction of the Jakarta-Yogyakarta Railroad throughthe Banyumas Karesidenan (1914-1917)

Zenodo (CERN European Organization for Nuclear Research)
Architectural and Urban Studies
article

The Dynamics of the Construction of the Jakarta-Yogyakarta Railroad throughthe Banyumas Karesidenan (1914-1917)

article en

Abstract

This research was conducted with the aim of complementing the study of the topic of the history of civil engineering technology from the colonial period which explains thedevelopment of rail-based transportation networks, as well as the trial and error of new technology trials at that time. In this research, it is expected to obtain a basic and detailed explanation of the planning, location determination, and construction process. In addition, the research that took place on the Cirebon-Kroya railway line concentrated on the Notog-Kebasen segment reviewed the development of the railway network in Java which was closely related to the transportation revolution in the application of new technology in Java, including the construction system of tunnels, roads, and bridges (mentioned as wisdom buildings), located in the Notog-Kebasen area. The explanation in this research is presented in a chronological, systematic, and qualitative analysis, to examine the topic of the history of civil engineering technology in the construction of the railroad network, including the wisdom building. The construction of the Cirebon-Kroya railway refers to the law of December 31, 1912 Stbl. 32/(1913), in which the 75 km Cirebon-Margasari section was opened on July 1, 1916, the 51 km Kroya-Margasari section was opened on July 1, 1916, and the 32 km Patuguran-Margasari section was opened on January 1, 1907.

Zenodo (CERN European Organization for Nuclear Research)
Universitas Gadjah Mada (ID)
Sustainable cities and communities
Openalex Percentile: Top 41%
Architectural and Urban Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.