Financial Feasibility Study of Binjai – Langsa (Pangkalan Brandan – Langsa Section) Toll Road Project

Abstract : This study evaluates the Financial Feasibility of the Pangkalan Brandan – Langsa Toll Road Section Project. The purpose of this study is to calculate the Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP), Discounted Payback Period, and Profitability Index (PI) for the Pangkalan Brandan – Langsa Toll Road Section Project. The study results show that this project has a positive Net Present Value (NPV) of Rp. 12,773,885,792,000, therefore it is financially feasible. The project also has an Internal Rate of Return (IRR) of 13.26% which is higher than the discount rate of 9.22%, therefore it is financially feasible, and a Payback Period (PP) of 16.4 years and a Discounted Payback Period of 27.7 years which are still within the 50-year concession period, therefore it is financially feasible. Additionally, this project has a Profitability Index (PI) of 2.5190 which is higher than 1, making it financially feasible. In conclusion, the Binjai – Langsa Toll Road Project (Pangkalan Brandan – Langsa Section) is financially feasible. The recommendation given is timely project execution to avoid cost overruns.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-08-14
DOI
https://doi.org/10.5281/zenodo.13318788
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Financial Feasibility Study of Binjai – Langsa (Pangkalan Brandan – Langsa Section) Toll Road Project

Zenodo (CERN European Organization for Nuclear Research)
Occupational Health and Safety Management
article

Financial Feasibility Study of Binjai – Langsa (Pangkalan Brandan – Langsa Section) Toll Road Project

article en

Abstract

Abstract : This study evaluates the Financial Feasibility of the Pangkalan Brandan – Langsa Toll Road Section Project. The purpose of this study is to calculate the Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP), Discounted Payback Period, and Profitability Index (PI) for the Pangkalan Brandan – Langsa Toll Road Section Project. The study results show that this project has a positive Net Present Value (NPV) of Rp. 12,773,885,792,000, therefore it is financially feasible. The project also has an Internal Rate of Return (IRR) of 13.26% which is higher than the discount rate of 9.22%, therefore it is financially feasible, and a Payback Period (PP) of 16.4 years and a Discounted Payback Period of 27.7 years which are still within the 50-year concession period, therefore it is financially feasible. Additionally, this project has a Profitability Index (PI) of 2.5190 which is higher than 1, making it financially feasible. In conclusion, the Binjai – Langsa Toll Road Project (Pangkalan Brandan – Langsa Section) is financially feasible. The recommendation given is timely project execution to avoid cost overruns.

Zenodo (CERN European Organization for Nuclear Research)
Bandung Institute of Technology (ID), Pertamina (Indonesia) (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 39%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.