OPUS Deliverable 4.3 Action Plans to Implement the Pilots – Final

This document updates D4.1 Action Plans to Implement the Pilots – Initial. After the first 9 months of pilot implementation (18 months in total), it presents the revised action plans of the Pilot Organisations for the second stage of implementation. As a replacement for D4.1, this deliverable is written in the future tense and does not include reporting/monitoring considerations, which are covered in D2.3 and D2.4 for the intermediate and final evaluations of the interventions, and in D3.3 and D3.4 for the evaluations of the indicators. Instead, this report provides the most updated information on the selected indicators (including baselines and targets) and the interventions (including baseline and targets) designed to implement those indicators. A monitoring plan has been established to track progress, and bimonthly mutual learning sessions are planned to facilitate the exchange of experiences among the pilots. The present document includes the five revised action plans elaborated by the Pilot Organisations of the OPUS project. The introduction section provides background information on the deliverable (1.1) and the methodology carried out for its completion (1.2).

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-11-06
DOI
https://doi.org/10.5281/zenodo.14046982
Primary Topic
Evaluation and Performance Assessment
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

OPUS Deliverable 4.3 Action Plans to Implement the Pilots – Final

Zenodo (CERN European Organization for Nuclear Research)
Evaluation and Performance Assessment
article

OPUS Deliverable 4.3 Action Plans to Implement the Pilots – Final

article en

Abstract

This document updates D4.1 Action Plans to Implement the Pilots – Initial. After the first 9 months of pilot implementation (18 months in total), it presents the revised action plans of the Pilot Organisations for the second stage of implementation. As a replacement for D4.1, this deliverable is written in the future tense and does not include reporting/monitoring considerations, which are covered in D2.3 and D2.4 for the intermediate and final evaluations of the interventions, and in D3.3 and D3.4 for the evaluations of the indicators. Instead, this report provides the most updated information on the selected indicators (including baselines and targets) and the interventions (including baseline and targets) designed to implement those indicators. A monitoring plan has been established to track progress, and bimonthly mutual learning sessions are planned to facilitate the exchange of experiences among the pilots. The present document includes the five revised action plans elaborated by the Pilot Organisations of the OPUS project. The introduction section provides background information on the deliverable (1.1) and the methodology carried out for its completion (1.2).

Zenodo (CERN European Organization for Nuclear Research)
University of Lisbon (PT), Universidade Nova de Lisboa (PT)
Partnerships for the goals
Openalex Percentile: Top 56%
Evaluation and Performance Assessment
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.