Causes of Delays of Aluminum Fabrication and Installation in Construction Projects in Addis Ababa

Delays on construction projects are w result in several negative effects like disputes, lawsuits, total dissertation and abandonment. Thus, identifying, ranking and confronting the causes of delay This paper identifies the causes construction projects in Addis Ababa. categorized in 8 major groups. 43 Contractors, 21 Consultants, and 19 Aluminum Fabricators were asked to evaluate frequency and severity of each cause. Data were analyzed with frequency and importance indices. Agreement of the rankings of importance of the causes between groups was tested. Findings of the research revealed that a consultants experienced a 42% and 52% of delay the groups of respondents attest that cause of delay. They also share the view that important. Consultants distinctly perceive whereas Contractors regard Fabricators view that Material Related causes are second in line. Relative agreement of rank of causes between groups showed a high degree of correlation among the groups of respondents. viii worldwide phenomena. Construction projects delays are important. of delay in aluminum fabrication and installation in This study revealed a total of 52 causes . about 90% of the contractors and 85% of the average delay over original contract period. All Owner induced factors are the most frequent and severe Contractor Related causes are third most that Project related causes are second most severe, related causes as runner-ups. Fabricators hold the

Institutions

Publication Details

Journal
National Academic Digital Repository of Ethiopia
Published
2026-05-01
DOI
https://doi.org/10.20372/nadre/8269
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Causes of Delays of Aluminum Fabrication and Installation in Construction Projects in Addis Ababa

National Academic Digital Repository of Ethiopia
Construction Project Management and Performance
article

Causes of Delays of Aluminum Fabrication and Installation in Construction Projects in Addis Ababa

article en

Abstract

Delays on construction projects are w result in several negative effects like disputes, lawsuits, total dissertation and abandonment. Thus, identifying, ranking and confronting the causes of delay This paper identifies the causes construction projects in Addis Ababa. categorized in 8 major groups. 43 Contractors, 21 Consultants, and 19 Aluminum Fabricators were asked to evaluate frequency and severity of each cause. Data were analyzed with frequency and importance indices. Agreement of the rankings of importance of the causes between groups was tested. Findings of the research revealed that a consultants experienced a 42% and 52% of delay the groups of respondents attest that cause of delay. They also share the view that important. Consultants distinctly perceive whereas Contractors regard Fabricators view that Material Related causes are second in line. Relative agreement of rank of causes between groups showed a high degree of correlation among the groups of respondents. viii worldwide phenomena. Construction projects delays are important. of delay in aluminum fabrication and installation in This study revealed a total of 52 causes . about 90% of the contractors and 85% of the average delay over original contract period. All Owner induced factors are the most frequent and severe Contractor Related causes are third most that Project related causes are second most severe, related causes as runner-ups. Fabricators hold the

National Academic Digital Repository of Ethiopia
Addis Ababa University (ET)
Openalex Percentile: Top 100%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Causes of Delays of Aluminum Fabrication and Installation in Construction Projects in Addis Ababa · National Academic Digital Repository of Ethiopia (2026) | TGRS Research Map | TGRS