Cost Estimation of Construction Projects under Risk and Cost-Influencing Factors

For the contractor to achieve maximum benefit, it is always necessary to minimize total project cost. Thus, a cost estimation process should be established to estimate the cost of completing the project with the required precision. Furthermore, construction projects are often carried out within a complex and dynamic environment where a number of interconnected factors can lead to uncertainty. To address these complexities, this study introduces a comprehensive approach for estimating construction project costs. Fifteen key risk factors and cost-influencing factors are extracted and identified based on a literature survey and experts' judgment. Different approaches, encompassing artificial neural network (ANN), adaptive neuro fuzzy inference system (ANFIS), and regression, are used to estimate the project cost. Data envelopment analysis (DEA) is used to ascertain the most influential factors and risks on the total project cost. Data from 48 construction projects are collected, and DEA is effectively employed to evaluate the factors. The results of DEA and correlation analysis show that eight significant factors affect project cost, including number of project team members, risk of fluctuation in material price, project size, labor productivity, consultant experience, labor availability, and material monopoly. ANN is selected as the preferred method for project cost estimation with the minimum MAPE (Mean Absolute Percentage Error). Sensitivity analysis is performed to demonstrate the applicability of DEA in identifying the influential factors. The results indicate that the proposed ANN model, incorporating eight factors, predicts project costs with an acceptable margin of error.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-10-01
DOI
https://doi.org/10.22115/scce.2024.447361.1813
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost Estimation of Construction Projects under Risk and Cost-Influencing Factors

SHILAP Revista de lepidopterología
Construction Project Management and Performance
article

Cost Estimation of Construction Projects under Risk and Cost-Influencing Factors

article en

Abstract

For the contractor to achieve maximum benefit, it is always necessary to minimize total project cost. Thus, a cost estimation process should be established to estimate the cost of completing the project with the required precision. Furthermore, construction projects are often carried out within a complex and dynamic environment where a number of interconnected factors can lead to uncertainty. To address these complexities, this study introduces a comprehensive approach for estimating construction project costs. Fifteen key risk factors and cost-influencing factors are extracted and identified based on a literature survey and experts' judgment. Different approaches, encompassing artificial neural network (ANN), adaptive neuro fuzzy inference system (ANFIS), and regression, are used to estimate the project cost. Data envelopment analysis (DEA) is used to ascertain the most influential factors and risks on the total project cost. Data from 48 construction projects are collected, and DEA is effectively employed to evaluate the factors. The results of DEA and correlation analysis show that eight significant factors affect project cost, including number of project team members, risk of fluctuation in material price, project size, labor productivity, consultant experience, labor availability, and material monopoly. ANN is selected as the preferred method for project cost estimation with the minimum MAPE (Mean Absolute Percentage Error). Sensitivity analysis is performed to demonstrate the applicability of DEA in identifying the influential factors. The results indicate that the proposed ANN model, incorporating eight factors, predicts project costs with an acceptable margin of error.

SHILAP Revista de lepidopterología
University of Tehran (IR)
Decent work and economic growth
Openalex Percentile: Top 50%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.