A typical scenario generation method for renewable energy power systems based on time-sequenced operational simulations
Traditional clustering methods based on source-load information struggle to accurately describe the time-sequenced operational characteristics of renewable energy power systems. To address this, a typical scenario generation method for renewable energy power systems based on time-sequenced operational simulations is proposed, considering both the AC power flow distribution and startup-shutoff strategies for units. Firstly, a unit combination model that incorporates AC power flow constraints is constructed, and a two-stage solution strategy based on second-order cone relaxation is adopted to perform 8,760-hour time-sequenced simulations in the multi-period optimal power flow model. Secondly, based on data characteristics such as renewable energy output levels, line congestion conditions, and unit startup-shutoff from the time-sequenced simulation results, an improved K-means algorithm is employed to extract typical scenarios. Finally, the validity of the proposed method is verified through a case study, providing a reference for renewable energy power system planning and scheduling.
Institutions
- China Electric Equipment Group (China) (CN)
- China Design Group (China) (CN)
- Economic Research Institute (BG)
Publication Details
- Journal
- SHILAP Revista de lepidopterología
- Published
- 2025-05-01
- DOI
- https://doi.org/10.19585/j.zjdl.202505007
- Primary Topic
- Integrated Energy Systems Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00