New beam loss monitor ionisation chambers engineering

More than 4000 Beam Loss Monitors (BLM) systems are operating at CERN. About 93% of them are installed in the LHC machine. The Ionisation Chambers (IC) are the part of the system where the lost beam particles ionise nitrogen gas in a chamber with electrodes at high voltage. The resulting current indicates the quantity of the beam loss. In the last 20 years, all BLM ICs were produced in collaboration with external institutes. Control of all details of the materials and processes are required to ensure instrument sensitivity and precision across the large series. CERN took back this production process in 2022 and much of the specific knowledge of design details and production technology was required to be re-engineered. This work presents production specification, design of tooling and test facilities for the first prototypes of a new series to be produced including their test in CERN facilities with beam. The further ramp-up to an industrial process to allow for a production of 1000 units in the years to come is discussed.

Publication Details

Published
2024-12-18
DOI
https://doi.org/10.18429/jacow-ibic2024-thp32
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

New beam loss monitor ionisation chambers engineering

Particle Accelerators and Free-Electron Lasers
article

New beam loss monitor ionisation chambers engineering

article en

Abstract

More than 4000 Beam Loss Monitors (BLM) systems are operating at CERN. About 93% of them are installed in the LHC machine. The Ionisation Chambers (IC) are the part of the system where the lost beam particles ionise nitrogen gas in a chamber with electrodes at high voltage. The resulting current indicates the quantity of the beam loss. In the last 20 years, all BLM ICs were produced in collaboration with external institutes. Control of all details of the materials and processes are required to ensure instrument sensitivity and precision across the large series. CERN took back this production process in 2022 and much of the specific knowledge of design details and production technology was required to be re-engineered. This work presents production specification, design of tooling and test facilities for the first prototypes of a new series to be produced including their test in CERN facilities with beam. The further ramp-up to an industrial process to allow for a production of 1000 units in the years to come is discussed.

Industry, innovation and infrastructure
Openalex Percentile: Top 68%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

New beam loss monitor ionisation chambers engineering · (2024) | TGRS Research Map | TGRS