Impact Analysis of Pipe Jacking Crossing and Parallel Construction on Existing Metro Shield Tunnels

[Objective] In underground excavation projects, the working conditions of tunnels crossing each other are becoming increasingly frequent and complex. It is therefore imperative to investigate their interactions and mutual impact mechanisms to control tunnel deformation within a reasonable range. [Method] Based on an engineering case of pipe jacking crossing an existing shield tunnel, a simulation analysis is conducted to study the impact patterns of pipe jacking and parallel construction on the existing metro shield tunnel, and the results are validated against actual measurement data. [Result & Conclusion] The deformation of existing tunnel decreases as the distance from the pipe jacking expands. During the pipe jacking vertical crossing, the maximum deformation of the existing metro tunnel occurs at the central axis of the pipe jacking. Within 12 meters of the pipe jacking excavation face from the central axis of the metro shield tunnel, the deformation of the metro shield tunnel reaches its maximum. For pipe jacking parallel crossing construction, the influence zone primarily extends 20 meters ahead of and 10 meters behind the pipe jacking excavation face.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-03-01
DOI
https://doi.org/10.16037/j.1007-869x.2025.03.006
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact Analysis of Pipe Jacking Crossing and Parallel Construction on Existing Metro Shield Tunnels

SHILAP Revista de lepidopterología
Civil and Geotechnical Engineering Research
article

Impact Analysis of Pipe Jacking Crossing and Parallel Construction on Existing Metro Shield Tunnels

article en

Abstract

[Objective] In underground excavation projects, the working conditions of tunnels crossing each other are becoming increasingly frequent and complex. It is therefore imperative to investigate their interactions and mutual impact mechanisms to control tunnel deformation within a reasonable range. [Method] Based on an engineering case of pipe jacking crossing an existing shield tunnel, a simulation analysis is conducted to study the impact patterns of pipe jacking and parallel construction on the existing metro shield tunnel, and the results are validated against actual measurement data. [Result & Conclusion] The deformation of existing tunnel decreases as the distance from the pipe jacking expands. During the pipe jacking vertical crossing, the maximum deformation of the existing metro tunnel occurs at the central axis of the pipe jacking. Within 12 meters of the pipe jacking excavation face from the central axis of the metro shield tunnel, the deformation of the metro shield tunnel reaches its maximum. For pipe jacking parallel crossing construction, the influence zone primarily extends 20 meters ahead of and 10 meters behind the pipe jacking excavation face.

SHILAP Revista de lepidopterología
Anyang Normal University (CN), Anyang Institute of Technology (CN), Fujian University of Technology (CN), Anyang University (KR)
Sustainable cities and communities
Openalex Percentile: Top 32%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Impact Analysis of Pipe Jacking Crossing and Parallel Construction on Existing Metro Shield Tunnels · SHILAP Revista de lepidopterología (2025) | TGRS Research Map | TGRS