Structural Force Monitoring and Calculation of the Metro Shield Tunnel in Subsea Weathered Slot

Objective In order to explore the load distribution characteristics of shield tunnel structures in subsea weathered slot, a study on the internal force response law of the segment structures is carried out. Method Relying on a cross-sea metro shield tunnel project, systematic monitoring of water-soil loads and structural internal forces of the segments is carried out for the subsea weathered slot section. Through data analysis, the distribution characteristics of the tunnel structural loads and internal forces in this area are revealed. The fatigue characteristics of the segments under tidal load are further verified. Result & Conclusion ① The monitoring results show that the soil and water pressures and the internal forces of the reinforcement tend to stabilize after significant fluctuations in the initial stage. In the stable stage, water-soil pressure is maintained within the range of 0.1~0.4 MPa, the stress range of the inside reinforcement is -2.19~-38.60 MPa, and that of the outside reinforcement is -6.95~-34.59 MPa. The ratio between the calculated and measured values of the reinforcement stress is 0.6~1.8, which shows a good consistency. ② The water-soil loads on the segments show corresponding fluctuations with the periodic changes of the tidal water level (period of 12 h). The maximum main stress level at the segment joint is -2.45~-2.60 MPa, the stress amplitude is between 0.31~0.34 MPa, and the stress ratio is between 0.87~0.96. ③ Under different tidal load amplitude conditions, the segment stress level remains relatively stable, while the stress amplitude increases linearly with the increase of tidal load amplitude, and the stress ratio shows a linear downward trend. When the tidal load amplitude reaches 5 times of the actual measured value, the main stress amplitude of the segment increases to 1.70 MPa, and the stress ratio decreases to 0.84, at this time the maximum value of the concrete main stress ranges from -1.6 to -3.6 MPa.

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-10-01
DOI
https://doi.org/10.16037/j.1007-869x.2024.10.021
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Structural Force Monitoring and Calculation of the Metro Shield Tunnel in Subsea Weathered Slot

SHILAP Revista de lepidopterología
Civil and Geotechnical Engineering Research
article

Structural Force Monitoring and Calculation of the Metro Shield Tunnel in Subsea Weathered Slot

article en

Abstract

Objective In order to explore the load distribution characteristics of shield tunnel structures in subsea weathered slot, a study on the internal force response law of the segment structures is carried out. Method Relying on a cross-sea metro shield tunnel project, systematic monitoring of water-soil loads and structural internal forces of the segments is carried out for the subsea weathered slot section. Through data analysis, the distribution characteristics of the tunnel structural loads and internal forces in this area are revealed. The fatigue characteristics of the segments under tidal load are further verified. Result & Conclusion ① The monitoring results show that the soil and water pressures and the internal forces of the reinforcement tend to stabilize after significant fluctuations in the initial stage. In the stable stage, water-soil pressure is maintained within the range of 0.1~0.4 MPa, the stress range of the inside reinforcement is -2.19~-38.60 MPa, and that of the outside reinforcement is -6.95~-34.59 MPa. The ratio between the calculated and measured values of the reinforcement stress is 0.6~1.8, which shows a good consistency. ② The water-soil loads on the segments show corresponding fluctuations with the periodic changes of the tidal water level (period of 12 h). The maximum main stress level at the segment joint is -2.45~-2.60 MPa, the stress amplitude is between 0.31~0.34 MPa, and the stress ratio is between 0.87~0.96. ③ Under different tidal load amplitude conditions, the segment stress level remains relatively stable, while the stress amplitude increases linearly with the increase of tidal load amplitude, and the stress ratio shows a linear downward trend. When the tidal load amplitude reaches 5 times of the actual measured value, the main stress amplitude of the segment increases to 1.70 MPa, and the stress ratio decreases to 0.84, at this time the maximum value of the concrete main stress ranges from -1.6 to -3.6 MPa.

SHILAP Revista de lepidopterología
Life below water
Openalex Percentile: Top 40%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.