Study on Integration Mode of Station-level Weak Current System in Urban Rail Transit

Objective Restricted by operation and maintenance management modes, the traditional station-level weak current systems generally adopt a separate computer room mode, causing a certain waste of civil construction scale. Therefore, it is necessary to study the integration mode for weak current system at station-level in urban rail transit. Method Based on the current integration status of urban rail transit station-level weak current systems and combined with the project on Beijing Rail Transit Line 22, research and analysis are conducted on the computer room space and resource integration of station-level weak current systems. Result & Conclusion After system analysis, resource integration of some equipment in the station-level weak current systems (such as communication system, integrated monitoring system, automatic ticket vending and checking system, access control system and signal system) to the cloud is realized, which can comprehensively save about 3 m to 5 m of station space, and 250 000 to 300 000 yuan equipment construction investment. At the same time, the resource integration achieves the goal of reducing building space and gas extinguishing rooms, optimizing the pipe networks and so on.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-10-01
DOI
https://doi.org/10.16037/j.1007-869x.2024.10.035
Primary Topic
Safety and Risk Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on Integration Mode of Station-level Weak Current System in Urban Rail Transit

SHILAP Revista de lepidopterología
Safety and Risk Management
article

Study on Integration Mode of Station-level Weak Current System in Urban Rail Transit

article en

Abstract

Objective Restricted by operation and maintenance management modes, the traditional station-level weak current systems generally adopt a separate computer room mode, causing a certain waste of civil construction scale. Therefore, it is necessary to study the integration mode for weak current system at station-level in urban rail transit. Method Based on the current integration status of urban rail transit station-level weak current systems and combined with the project on Beijing Rail Transit Line 22, research and analysis are conducted on the computer room space and resource integration of station-level weak current systems. Result & Conclusion After system analysis, resource integration of some equipment in the station-level weak current systems (such as communication system, integrated monitoring system, automatic ticket vending and checking system, access control system and signal system) to the cloud is realized, which can comprehensively save about 3 m to 5 m of station space, and 250 000 to 300 000 yuan equipment construction investment. At the same time, the resource integration achieves the goal of reducing building space and gas extinguishing rooms, optimizing the pipe networks and so on.

SHILAP Revista de lepidopterología
China Railway Signal & Communication (China) (CN), Beijing Urban Construction Design & Development Group (China) (CN), China Railway Construction Corporation (China) (CN), Beijing Municipal Engineering Design and Research Institute (China) (CN)
Openalex Percentile: Top 52%
Safety and Risk Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Study on Integration Mode of Station-level Weak Current System in Urban Rail Transit · SHILAP Revista de lepidopterología (2024) | TGRS Research Map | TGRS