Economic lot scheduling problem under two different rework policies

At the end of the 20th century, inventory problems involving defective items have been relevant to production systems research. This paper provides an economic lot scheduling problem (ELSP) for a defective manufacturing system with scrap and reworked items involving multiple products, and two separate policies to handle the defective items. The defective items will be reworked and converted into useful items. In the first policy, all defective items are deposited in a warehouse until all production periods are completed, and then, after n production cycles, a separate rework process is implemented. In the second policy, all reworkable items are repaired in the same production cycle, i.e., as soon as the production phase concludes, the rework process starts immediately. Finally, each problem is solved using a closed-form approach, employing the derivative method for solution, and a sensitivity analysis is performed. Both policies are compared, and some managerial insights are presented to identify which one is better and why.

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2025-12-19
DOI
https://doi.org/10.1051/ro/2025020/pdf
Primary Topic
Supply Chain and Inventory Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Economic lot scheduling problem under two different rework policies

Springer Link (Chiba Institute of Technology)
Supply Chain and Inventory Management
article

Economic lot scheduling problem under two different rework policies

article en

Abstract

At the end of the 20th century, inventory problems involving defective items have been relevant to production systems research. This paper provides an economic lot scheduling problem (ELSP) for a defective manufacturing system with scrap and reworked items involving multiple products, and two separate policies to handle the defective items. The defective items will be reworked and converted into useful items. In the first policy, all defective items are deposited in a warehouse until all production periods are completed, and then, after n production cycles, a separate rework process is implemented. In the second policy, all reworkable items are repaired in the same production cycle, i.e., as soon as the production phase concludes, the rework process starts immediately. Finally, each problem is solved using a closed-form approach, employing the derivative method for solution, and a sensitivity analysis is performed. Both policies are compared, and some managerial insights are presented to identify which one is better and why.

Springer Link (Chiba Institute of Technology)
Openalex Percentile: Top 40%
Supply Chain and Inventory Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Economic lot scheduling problem under two different rework policies · Springer Link (Chiba Institute of Technology) (2025) | TGRS Research Map | TGRS