Discharge Forecasting in Monsoonal Gung Watershed: A Comparative Analysis of F. J. Mock, Markov, and ARIMA Models

\nWater resources are crucial for human needs along with their increasing demand due to rapid population growth. Nevertheless, water availability is readily limited, and disaster might also occur due to unplanned water infrastructure management. Gung watershed, as a primary water resource, is vulnerable in water availability and flood, primarily influenced by land cover degradation. Moreover, no prior research has been conducted to obtain accurate discharge forecasting in this area. In reinforcing disaster mitigation and infrastructure planning, our recent work utilizes a 10-year dataset of hydrometeorological data (2013-2022) in the monsoonal Gung watershed. A comparative study of F. J. Mock, Markov, and ARIMA models shows that all three models are excellent in forecasting discharge with more than 80% correlation to its observed value. Markov model performs best (r=0.91; NSE=0.82), followed by ARIMA and F. J. Mock models. Aside from discharge forecasting, this study offers a reference for strategic planning in water resources infrastructure and disaster mitigation efforts.\n

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2024-08-15
DOI
https://doi.org/10.1051/e3sconf/202455702002/pdf
Primary Topic
Flood Risk Assessment and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Discharge Forecasting in Monsoonal Gung Watershed: A Comparative Analysis of F. J. Mock, Markov, and ARIMA Models

Springer Link (Chiba Institute of Technology)
Flood Risk Assessment and Management
article

Discharge Forecasting in Monsoonal Gung Watershed: A Comparative Analysis of F. J. Mock, Markov, and ARIMA Models

article en

Abstract

\nWater resources are crucial for human needs along with their increasing demand due to rapid population growth. Nevertheless, water availability is readily limited, and disaster might also occur due to unplanned water infrastructure management. Gung watershed, as a primary water resource, is vulnerable in water availability and flood, primarily influenced by land cover degradation. Moreover, no prior research has been conducted to obtain accurate discharge forecasting in this area. In reinforcing disaster mitigation and infrastructure planning, our recent work utilizes a 10-year dataset of hydrometeorological data (2013-2022) in the monsoonal Gung watershed. A comparative study of F. J. Mock, Markov, and ARIMA models shows that all three models are excellent in forecasting discharge with more than 80% correlation to its observed value. Markov model performs best (r=0.91; NSE=0.82), followed by ARIMA and F. J. Mock models. Aside from discharge forecasting, this study offers a reference for strategic planning in water resources infrastructure and disaster mitigation efforts.\n

Springer Link (Chiba Institute of Technology)
Openalex Percentile: Top 71%
Flood Risk Assessment and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.