Determination of predicted output for different heights of wind turbine location

\nToday the world is experiencing a significant increase in the capacity of renewable energy sources. Current development forecasts tell us that renewable energy sources (RES) could account for up to 20% of the global energy mix by 2030 (excluding large-scale hydropower). But the forecasts will be realized if these energy sources are developed and introduced into the practice of producing electrical energy as quickly and widely as possible. It will take 30 to 50 years for new energy sources to increase their share of the total energy budget from 1% to 10%. In world practice, the use of wind turbines with a capacity of up to 1 MW is considered unpromising. Wind turbines with a capacity of up to 3 MW have received great development. In 2008, the first wind generators with a capacity of 6…8 MW were built in Europe. Investments in the development of Russian wind energy using new wind turbines from EVIAG AG, namely EV 90 and EV 100 are promising. It has been revealed that the total output over the service life of the facility constantly increases with height. However, taking into account the increase in one-time costs during the construction of the facility, the increase in the cost of its operation, we can conclude that the most acceptable tower height for the Turbowind T 600-48 will be within 50...60 m, and for the Eviag EV 100 - 90…100 m. Knowing that the cost of the construction part of wind energy complex facilities in most cases is approximately 10…40% of the cost of the wind turbine itself, and at the same time as calculations have shown an increase in costs associated with changing the height of the tower by 20% gives an increase in profit by 60%, you can quite profitably operate with the tower height parameter, taking the most rational.\n

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2024-11-20
DOI
https://doi.org/10.1051/e3sconf/202459201009/pdf
Primary Topic
Wind Energy Research and Development
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Determination of predicted output for different heights of wind turbine location

Springer Link (Chiba Institute of Technology)
Wind Energy Research and Development
article

Determination of predicted output for different heights of wind turbine location

article en

Abstract

\nToday the world is experiencing a significant increase in the capacity of renewable energy sources. Current development forecasts tell us that renewable energy sources (RES) could account for up to 20% of the global energy mix by 2030 (excluding large-scale hydropower). But the forecasts will be realized if these energy sources are developed and introduced into the practice of producing electrical energy as quickly and widely as possible. It will take 30 to 50 years for new energy sources to increase their share of the total energy budget from 1% to 10%. In world practice, the use of wind turbines with a capacity of up to 1 MW is considered unpromising. Wind turbines with a capacity of up to 3 MW have received great development. In 2008, the first wind generators with a capacity of 6…8 MW were built in Europe. Investments in the development of Russian wind energy using new wind turbines from EVIAG AG, namely EV 90 and EV 100 are promising. It has been revealed that the total output over the service life of the facility constantly increases with height. However, taking into account the increase in one-time costs during the construction of the facility, the increase in the cost of its operation, we can conclude that the most acceptable tower height for the Turbowind T 600-48 will be within 50...60 m, and for the Eviag EV 100 - 90…100 m. Knowing that the cost of the construction part of wind energy complex facilities in most cases is approximately 10…40% of the cost of the wind turbine itself, and at the same time as calculations have shown an increase in costs associated with changing the height of the tower by 20% gives an increase in profit by 60%, you can quite profitably operate with the tower height parameter, taking the most rational.\n

Springer Link (Chiba Institute of Technology)
Affordable and clean energy
Openalex Percentile: Top 41%
Wind Energy Research and Development
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Determination of predicted output for different heights of wind turbine location · Springer Link (Chiba Institute of Technology) (2024) | TGRS Research Map | TGRS