Determinants of delay in small construction projects: evidence from Brazil

Despite the vast literature addressing the main causes of delays in construction projects, the influence of the size of the project remains ill-explored. To fill this gap, the determinants of delays in completing small construction projects (SCP) were analyzed. Based on prevalent literature on large projects, a six-factor theoretical structure was proposed. This theoretical structure was reduced from 6 factors (23 variables) to 3 factors (11 variables) through exploratory factor analysis. The data were gathered from a survey of professionals in the Brazilian construction industry, resulting in a sample of 106 valid respondents. Results show that variables and explanatory factors for the delay in completing SCP are contextual and economically dependent. Specifically, they evidenced the prominence of causes related to ‘Quality of design’, ‘Manpower’, and ‘Materials’. Compared with the dominant literature, they indicate significant differences in delay causes between SCP and larger projects. The study can improve SCP management practices as project and construction managers could apply the findings to guide decision-making processes throughout all project phases and to design methods and techniques to improve efficiency and reduce delays in the sector. Ten practical recommendations were provided from a multilevel perspective (firm, industry and society level). To the best of our knowledge, this is the first study to address the wide range of causes of delays in completing SCP in the Brazilian context using a structured quantitative method.

Publication Details

Journal
Figshare
Published
2025-01-01
DOI
https://doi.org/10.6084/m9.figshare.29236860
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Determinants of delay in small construction projects: evidence from Brazil

Figshare
Construction Project Management and Performance
article

Determinants of delay in small construction projects: evidence from Brazil

article en

Abstract

Despite the vast literature addressing the main causes of delays in construction projects, the influence of the size of the project remains ill-explored. To fill this gap, the determinants of delays in completing small construction projects (SCP) were analyzed. Based on prevalent literature on large projects, a six-factor theoretical structure was proposed. This theoretical structure was reduced from 6 factors (23 variables) to 3 factors (11 variables) through exploratory factor analysis. The data were gathered from a survey of professionals in the Brazilian construction industry, resulting in a sample of 106 valid respondents. Results show that variables and explanatory factors for the delay in completing SCP are contextual and economically dependent. Specifically, they evidenced the prominence of causes related to ‘Quality of design’, ‘Manpower’, and ‘Materials’. Compared with the dominant literature, they indicate significant differences in delay causes between SCP and larger projects. The study can improve SCP management practices as project and construction managers could apply the findings to guide decision-making processes throughout all project phases and to design methods and techniques to improve efficiency and reduce delays in the sector. Ten practical recommendations were provided from a multilevel perspective (firm, industry and society level). To the best of our knowledge, this is the first study to address the wide range of causes of delays in completing SCP in the Brazilian context using a structured quantitative method.

Figshare
Industry, innovation and infrastructure
Openalex Percentile: Top 51%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.