D1.8 - Annual progress reports (c)
This deliverable has the structure of the periodic report that is usually submitted before a review. It contains the work, progress, results, etc. for the time period between M19 and M30, and is intended to serve as a summary of the work to be reviewed at the 2nd review meeting scheduled for 24 March 2025.
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2025-02-28
- DOI
- https://doi.org/10.5281/zenodo.16742878
- Primary Topic
- Academic Publishing and Open Access
- Type
- article
- Field-Weighted Citation Impact
- 0.00