Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review

Almost all projects, whether government or private, experience change orders requested by either the contractor or the owner. In construction projects, change orders are regulated by contract provisions, which often result in project outcomes that deviate from the initial plans. This research aims to identify and analyze the factors that cause and influence Contract Change Orders (CCOs) on the cost and schedule of bore pile work for the Cisauk flyover construction project in Tangerang Regency. The study was conducted by distributing questionnaires to respondents involved in the Cisauk flyover construction project. The research employed quantitative analysis, with data from the questionnaires processed using the IBM SPSS program. The analysis methods included validity testing, reliability testing, normality testing, and factor analysis. From the study results, the ranking of each factor will be determined, and the dominant factors influencing the occurrence of Contract Change Orders (CCOs) will be identified.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-03-10
DOI
https://doi.org/10.5281/zenodo.14999548
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review

Zenodo (CERN European Organization for Nuclear Research)
Occupational Health and Safety Management
article

Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review

article en

Abstract

Almost all projects, whether government or private, experience change orders requested by either the contractor or the owner. In construction projects, change orders are regulated by contract provisions, which often result in project outcomes that deviate from the initial plans. This research aims to identify and analyze the factors that cause and influence Contract Change Orders (CCOs) on the cost and schedule of bore pile work for the Cisauk flyover construction project in Tangerang Regency. The study was conducted by distributing questionnaires to respondents involved in the Cisauk flyover construction project. The research employed quantitative analysis, with data from the questionnaires processed using the IBM SPSS program. The analysis methods included validity testing, reliability testing, normality testing, and factor analysis. From the study results, the ranking of each factor will be determined, and the dominant factors influencing the occurrence of Contract Change Orders (CCOs) will be identified.

Zenodo (CERN European Organization for Nuclear Research)
Mercu Buana University (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 41%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS