DETERMINANTS OF PROJECT DELAYS IN DIRE DAWA ADMINSTRATION: THE CASE OF GOVERNMENT OWNED CONSTRUCTION PROJECTS

Abstract The primary objective of this research study is to investigate the various causes of construction project delays in Dire Dawa Administration. In doing so, the researcher has employed dominantly quantitative research approach and the attributes are ranked in terms of their importance by using Relative Importance Index (RII). Moreover, both descriptive and explanatory (causal research) research designs via cross-sectional survey are utilized for this study in. The data has been collected from both primary and secondary sources. Census method of inquiry is employed through distributing 102 a self-administered questionnaire to clients/government bureaus, contractors and consultants of large government owned construction projects. Relative Importance Index technique, one way ANOVA, ordinal logistic regression model and chi-square analysis are used for data analysis. The descriptive statistics result has revealed that delay in the manufacture of building materials (RII=0.81), delays in producing design (RII=0.8), low productivity level of labors (RII=0.8), insufficient work by the contractors (RII=0.78),equipment shortage (RII=0.78), material types and specification changes in the construction (RII=0.75), equipment breakdowns (RII=0.75), design engineer’s inability to understand the requirements of the owner (RII=0.75), discrepancies in project designs RII=0.74) delay in the delivery of materials on time (RII=0.74)are the top five perceived causes of large construction projects in Dire Dawa Administration. As a result, reconsideration should be due on project planning and designing of construction projects in order to find out the factors harming the possibility of timely completion of the projects in which stakeholders such as owners, consultants and contractors have clearly defined goals.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-03-10
DOI
https://doi.org/10.5281/zenodo.14997571
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

DETERMINANTS OF PROJECT DELAYS IN DIRE DAWA ADMINSTRATION: THE CASE OF GOVERNMENT OWNED CONSTRUCTION PROJECTS

Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

DETERMINANTS OF PROJECT DELAYS IN DIRE DAWA ADMINSTRATION: THE CASE OF GOVERNMENT OWNED CONSTRUCTION PROJECTS

article en

Abstract

Abstract The primary objective of this research study is to investigate the various causes of construction project delays in Dire Dawa Administration. In doing so, the researcher has employed dominantly quantitative research approach and the attributes are ranked in terms of their importance by using Relative Importance Index (RII). Moreover, both descriptive and explanatory (causal research) research designs via cross-sectional survey are utilized for this study in. The data has been collected from both primary and secondary sources. Census method of inquiry is employed through distributing 102 a self-administered questionnaire to clients/government bureaus, contractors and consultants of large government owned construction projects. Relative Importance Index technique, one way ANOVA, ordinal logistic regression model and chi-square analysis are used for data analysis. The descriptive statistics result has revealed that delay in the manufacture of building materials (RII=0.81), delays in producing design (RII=0.8), low productivity level of labors (RII=0.8), insufficient work by the contractors (RII=0.78),equipment shortage (RII=0.78), material types and specification changes in the construction (RII=0.75), equipment breakdowns (RII=0.75), design engineer’s inability to understand the requirements of the owner (RII=0.75), discrepancies in project designs RII=0.74) delay in the delivery of materials on time (RII=0.74)are the top five perceived causes of large construction projects in Dire Dawa Administration. As a result, reconsideration should be due on project planning and designing of construction projects in order to find out the factors harming the possibility of timely completion of the projects in which stakeholders such as owners, consultants and contractors have clearly defined goals.

Zenodo (CERN European Organization for Nuclear Research)
Andhra University (IN), Jigjiga University (ET)
Openalex Percentile: Top 53%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

DETERMINANTS OF PROJECT DELAYS IN DIRE DAWA ADMINSTRATION: THE CASE OF GOVERNMENT OWNED CONSTRUCTION PROJECTS · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS