Sustainable Cost Management and Risk Evaluation in Prefabricated Infrastructure Projects under the Neutrosophic Bonferroni Mean Operator

The advent of prefabricated infrastructure has introduced a transformative shift in the construction sector, emphasizing speed, efficiency, and environmental consciousness. However, the economic and risk-related complexities tied to large-scale prefabrication demand a deeper exploration of sustainable cost management practices. This study aims to examine how systematic risk evaluation can be integrated into cost management frameworks to improve the financial and operational sustainability of prefabricated infrastructure projects. We use the multicriteria decision-making (MCDM) approach to Sustainable Cost Management and Risk Evaluation in Prefabricated Infrastructure Projects. This study uses eight criteria and six alternatives to be evaluated. Three experts evaluate the criteria and alternatives. The RANCOMARTASI framework is used to compute the criteria weights and rank the alternatives.

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-04-16
DOI
https://doi.org/10.5281/zenodo.15229667
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Sustainable Cost Management and Risk Evaluation in Prefabricated Infrastructure Projects under the Neutrosophic Bonferroni Mean Operator

SHILAP Revista de lepidopterología
Construction Project Management and Performance
article

Sustainable Cost Management and Risk Evaluation in Prefabricated Infrastructure Projects under the Neutrosophic Bonferroni Mean Operator

article en

Abstract

The advent of prefabricated infrastructure has introduced a transformative shift in the construction sector, emphasizing speed, efficiency, and environmental consciousness. However, the economic and risk-related complexities tied to large-scale prefabrication demand a deeper exploration of sustainable cost management practices. This study aims to examine how systematic risk evaluation can be integrated into cost management frameworks to improve the financial and operational sustainability of prefabricated infrastructure projects. We use the multicriteria decision-making (MCDM) approach to Sustainable Cost Management and Risk Evaluation in Prefabricated Infrastructure Projects. This study uses eight criteria and six alternatives to be evaluated. Three experts evaluate the criteria and alternatives. The RANCOMARTASI framework is used to compute the criteria weights and rank the alternatives.

SHILAP Revista de lepidopterología
Industry, innovation and infrastructure
Openalex Percentile: Top 53%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Sustainable Cost Management and Risk Evaluation in Prefabricated Infrastructure Projects under the Neutrosophic Bonferroni Mean Operator · SHILAP Revista de lepidopterología (2025) | TGRS Research Map | TGRS