Optimizing Culvert Design for Creek Overflow Management: Determining the Optimal Structural Solution

Flooding caused by creek overflow poses significant risks to communities, particularly in flood-prone areas with inadequate drainage infrastructure. This study examines the discharge capacity of Labni Creek in Brgy. Las Piñas, Peñaranda, Nueva Ecija, to identify appropriate engineering interventions for flood mitigation. Site inspections and hydraulic analysis revealed that the existing reinforced concrete pipe culvert is insufficient, with a discharge capacity of only 3.78 cubic meters per second, compared to the creek’s peak discharge of 89.8 cubic meters per second. The study also identified sediment accumulation, minimal vegetation, and the absence of flood control structures as key contributors to overflow. Using Manning’s and Rational Formulas, alternative structural solutions were evaluated, with a two-barrel box culvert emerging as the most effective design. This proposed structure meets AASHTO and DPWH standards, ensuring improved water flow management and reducing flood risks. The findings highlight the need for immediate intervention, including dredging, vegetation management, and upgraded culvert design, to enhance the creek’s resilience and safeguard surrounding communities from recurring flooding.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-04-18
DOI
https://doi.org/10.5281/zenodo.15241250
Primary Topic
Hydraulic flow and structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Culvert Design for Creek Overflow Management: Determining the Optimal Structural Solution

Zenodo (CERN European Organization for Nuclear Research)
Hydraulic flow and structures
article

Optimizing Culvert Design for Creek Overflow Management: Determining the Optimal Structural Solution

article en

Abstract

Flooding caused by creek overflow poses significant risks to communities, particularly in flood-prone areas with inadequate drainage infrastructure. This study examines the discharge capacity of Labni Creek in Brgy. Las Piñas, Peñaranda, Nueva Ecija, to identify appropriate engineering interventions for flood mitigation. Site inspections and hydraulic analysis revealed that the existing reinforced concrete pipe culvert is insufficient, with a discharge capacity of only 3.78 cubic meters per second, compared to the creek’s peak discharge of 89.8 cubic meters per second. The study also identified sediment accumulation, minimal vegetation, and the absence of flood control structures as key contributors to overflow. Using Manning’s and Rational Formulas, alternative structural solutions were evaluated, with a two-barrel box culvert emerging as the most effective design. This proposed structure meets AASHTO and DPWH standards, ensuring improved water flow management and reducing flood risks. The findings highlight the need for immediate intervention, including dredging, vegetation management, and upgraded culvert design, to enhance the creek’s resilience and safeguard surrounding communities from recurring flooding.

Zenodo (CERN European Organization for Nuclear Research)
Nueva Ecija University of Science and Technology (PH)
Openalex Percentile: Top 57%
Hydraulic flow and structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.