EIRENE PPP D8.3 – Evaluation methodology and a preliminary set of KPIs

This deliverable describes the development of a model using KPIs to monitor and evaluate the performance of EIRENE RI following the current preparation phase, i.e., the implementation and operation phases via key performance indicators (KPIs).

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-09-01
DOI
https://doi.org/10.5281/zenodo.13970723
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

EIRENE PPP D8.3 – Evaluation methodology and a preliminary set of KPIs

Zenodo (CERN European Organization for Nuclear Research)
Power System Reliability and Maintenance
article

EIRENE PPP D8.3 – Evaluation methodology and a preliminary set of KPIs

article en

Abstract

This deliverable describes the development of a model using KPIs to monitor and evaluate the performance of EIRENE RI following the current preparation phase, i.e., the implementation and operation phases via key performance indicators (KPIs).

Zenodo (CERN European Organization for Nuclear Research)
Flemish Institute for Technological Research (BE)
Openalex Percentile: Top 61%
Power System Reliability and Maintenance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

EIRENE PPP D8.3 – Evaluation methodology and a preliminary set of KPIs · Zenodo (CERN European Organization for Nuclear Research) (2024) | TGRS Research Map | TGRS