GEOTECHNICAL GROUND INVESTIGATION AND PILE-FOUNDATION INTERACTION FOR HUB RIVER BRIDGE

Abstract This research paper presents a comprehensive geotechnical site investigation and analysis of pile-foundation interaction for the Hub River Bridge. The site under consideration is characterized by alluvial deposits overlying a continuous bedrock, with distinct variations in soil composition and scouring phenomena. The top 15.0 meters of soil on either abutment side comprises predominantly alluvial deposits, transitioning into weak sandstone from depths ranging between 15.0 and 45.0 meters. In the middle portion of the bridge, the alluvial deposit extends up to 5.0 meters, succeeded by weak sandstone reaching depths of 45.0 meters. The presence of scouring has been observed, indicating potential challenges in foundation stability. The proposed foundation depth is determined based on pile diameter considerations, ranging from 0.75 meters to 2.0 meters. The design parameters aim to accommodate a service load of 950 tons. The study incorporates a thorough analysis of the subsurface conditions, considering the variations in soil types and potential scouring effects. Additionally, the paper addresses the implications of different pile diameters on the foundation design, ensuring structural integrity and load-bearing capacity. The bridge piles undergo analysis and length determination using the All Pile software. This software facilitates a comprehensive examination of pile behaviour and foundation interaction, ensuring that the designed piles meet the specified load requirements. The utilization of All Pile software allows for a precise and efficient design process, considering the complex geological conditions and variations in soil types. The findings from this research contribute valuable insights into the geotechnical considerations and pile-foundation interaction for the Hub River Bridge, aiding in the development of optimal foundation designs for safe and resilient infrastructure in similar geological settings.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-08-10
DOI
https://doi.org/10.5281/zenodo.13269826
Primary Topic
Robotic Locomotion and Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

GEOTECHNICAL GROUND INVESTIGATION AND PILE-FOUNDATION INTERACTION FOR HUB RIVER BRIDGE

Zenodo (CERN European Organization for Nuclear Research)
Robotic Locomotion and Control
article

GEOTECHNICAL GROUND INVESTIGATION AND PILE-FOUNDATION INTERACTION FOR HUB RIVER BRIDGE

article en

Abstract

Abstract This research paper presents a comprehensive geotechnical site investigation and analysis of pile-foundation interaction for the Hub River Bridge. The site under consideration is characterized by alluvial deposits overlying a continuous bedrock, with distinct variations in soil composition and scouring phenomena. The top 15.0 meters of soil on either abutment side comprises predominantly alluvial deposits, transitioning into weak sandstone from depths ranging between 15.0 and 45.0 meters. In the middle portion of the bridge, the alluvial deposit extends up to 5.0 meters, succeeded by weak sandstone reaching depths of 45.0 meters. The presence of scouring has been observed, indicating potential challenges in foundation stability. The proposed foundation depth is determined based on pile diameter considerations, ranging from 0.75 meters to 2.0 meters. The design parameters aim to accommodate a service load of 950 tons. The study incorporates a thorough analysis of the subsurface conditions, considering the variations in soil types and potential scouring effects. Additionally, the paper addresses the implications of different pile diameters on the foundation design, ensuring structural integrity and load-bearing capacity. The bridge piles undergo analysis and length determination using the All Pile software. This software facilitates a comprehensive examination of pile behaviour and foundation interaction, ensuring that the designed piles meet the specified load requirements. The utilization of All Pile software allows for a precise and efficient design process, considering the complex geological conditions and variations in soil types. The findings from this research contribute valuable insights into the geotechnical considerations and pile-foundation interaction for the Hub River Bridge, aiding in the development of optimal foundation designs for safe and resilient infrastructure in similar geological settings.

Zenodo (CERN European Organization for Nuclear Research)
NED University of Engineering and Technology (PK), Ziauddin University (PK)
Industry, innovation and infrastructure
Openalex Percentile: Top 72%
Robotic Locomotion and Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.