Progress and status of the FAIR proton linac

The progress and status of the high intensity short pulse 325 MHz proton linac driver for the FAIR facility in Darmstadt is described. The proton linac is designed to deliver a beam current of 70 mA at an energy of 68 MeV. The design of the normal conductiong CCH cavities was carried out in collaboration with our partners at the IAP Frankfurt and industrial partners. First bead pull measurements have been successfully performed on the CCH prototype. This prototype cavity is intended for later final production and copper plating. The construction of the ladder RFQ has been completed together with first rf measurements at levels up to 400 W. The RFQ has been delivered to FAIR and high power rf tests are expected to be performed on site during the next year. The proton driver, along with the antiproton chain of the FAIR project, has been postponed due to a re-prioritisation of the project and is now in a frozen state. All delivered components need to be brought to a state that is consistent with the project objectives. This will allow a smooth re-launch in the future. The status of this process is described in this paper.

Institutions

Publication Details

Journal
JACOW
Published
2024-10-25
DOI
https://doi.org/10.18429/jacow-linac2024-tupb026
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Progress and status of the FAIR proton linac

JACOW
Particle accelerators and beam dynamics
article

Progress and status of the FAIR proton linac

article en

Abstract

The progress and status of the high intensity short pulse 325 MHz proton linac driver for the FAIR facility in Darmstadt is described. The proton linac is designed to deliver a beam current of 70 mA at an energy of 68 MeV. The design of the normal conductiong CCH cavities was carried out in collaboration with our partners at the IAP Frankfurt and industrial partners. First bead pull measurements have been successfully performed on the CCH prototype. This prototype cavity is intended for later final production and copper plating. The construction of the ladder RFQ has been completed together with first rf measurements at levels up to 400 W. The RFQ has been delivered to FAIR and high power rf tests are expected to be performed on site during the next year. The proton driver, along with the antiproton chain of the FAIR project, has been postponed due to a re-prioritisation of the project and is now in a frozen state. All delivered components need to be brought to a state that is consistent with the project objectives. This will allow a smooth re-launch in the future. The status of this process is described in this paper.

JACOW
Goethe University Frankfurt (DE), GSI Helmholtz Centre for Heavy Ion Research (DE), European Organization for Nuclear Research (CH)
Industry, innovation and infrastructure
Openalex Percentile: Top 45%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.