Research on Construction Management Standardization of Shanghai Rail Transit Line 15

Objective Urban rail transit project construction involves numerous management objects, complex processes and technical requirements. The imperfect standardized management system leads to frequent construction quality and safety problems. Therefore, it is necessary to carry out management standardization research. Method In combination with the standardized management practice of Shanghai Rail Transit Line 15 construction management, the standardization methods for total factor management behaviors such as technology, quality, safety, risk, progress and civilized construction in the entire cycle of preliminary preparation, construction and completion acceptance are studied. A construction management standardization system with a three-tier architecture covering basic management behaviors, professional behaviors and supporting standards is established. A series of standardized management process, system, technical basis as well as standardized document and smart terminal are formed. Result & Conclusion Engineering practice proves that the proposed standardization management method can effectively promote the institutionalization and scientific process of engineering management, and guide urban rail transit engineering to achieve the construction goals of high efficiency, high quality and safety.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-10-01
DOI
https://doi.org/10.16037/j.1007-869x.2024.10.025
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Construction Management Standardization of Shanghai Rail Transit Line 15

SHILAP Revista de lepidopterología
Construction Project Management and Performance
article

Research on Construction Management Standardization of Shanghai Rail Transit Line 15

article en

Abstract

Objective Urban rail transit project construction involves numerous management objects, complex processes and technical requirements. The imperfect standardized management system leads to frequent construction quality and safety problems. Therefore, it is necessary to carry out management standardization research. Method In combination with the standardized management practice of Shanghai Rail Transit Line 15 construction management, the standardization methods for total factor management behaviors such as technology, quality, safety, risk, progress and civilized construction in the entire cycle of preliminary preparation, construction and completion acceptance are studied. A construction management standardization system with a three-tier architecture covering basic management behaviors, professional behaviors and supporting standards is established. A series of standardized management process, system, technical basis as well as standardized document and smart terminal are formed. Result & Conclusion Engineering practice proves that the proposed standardization management method can effectively promote the institutionalization and scientific process of engineering management, and guide urban rail transit engineering to achieve the construction goals of high efficiency, high quality and safety.

SHILAP Revista de lepidopterología
Shanghai Tunnel Engineering Rail Transit Design & Research Institute (CN)
Sustainable cities and communities
Openalex Percentile: Top 61%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.