Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit

[Objective] Manufacturing accuracy of the steel bridge pier, which is an important part of the suspended monorail transit system, determines the erection and installation of track beams, thereby affecting the train smooth running. Therefore, it is necessary to conduct research on it. [Method] Based on the Tourism Special Line Phase I Project, a supporting facility for Wuhan Optics Valley Ecological Corridor Tourism, the process research is conducted in response to the T-shaped structural characteristics of steel bridge piers for suspended monorail transit and combining the design requirements for the manufacturing accuracy of steel bridge piers. The difficulties in the manufacturing process of monorail steel bridge piers are analyzed, and the manufacturing schemes for the steel cap beams are compared and selected. Moreover, the manufacturing process and accuracy control methods of suspended monorail steel bridge piers are systematically expounded. [Result & Conclusion] Through the actual manufacturing of steel bridge piers and the on-site erection and installation of track beams, the distance between the lug plates of the steel cap beams (0-2 mm) and the distance from the cantilever center to the column central line (-2-2 mm) can be effectively controlled. After the overall assembly and formation of the steel bridge piers, the distance error between the line connecting the positioning point of the left cap beam pin axis to the center point at the steel column bottom, and the line connecting the positioning point of the right cap beam pin axis to the center point at the steel column bottom is ≤3 mm, and the elevation error between the center of the lug plate and the center of the column is ≤2 mm, meeting the requirements for the overall assembly and production of steel bridge piers, and realizing the control over the manufacturing accuracy of steel bridge piers.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-01-01
DOI
https://doi.org/10.16037/j.1007-869x.2025.01.045
Primary Topic
Structural Engineering and Vibration Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit

SHILAP Revista de lepidopterología
Structural Engineering and Vibration Analysis
article

Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit

article en

Abstract

[Objective] Manufacturing accuracy of the steel bridge pier, which is an important part of the suspended monorail transit system, determines the erection and installation of track beams, thereby affecting the train smooth running. Therefore, it is necessary to conduct research on it. [Method] Based on the Tourism Special Line Phase I Project, a supporting facility for Wuhan Optics Valley Ecological Corridor Tourism, the process research is conducted in response to the T-shaped structural characteristics of steel bridge piers for suspended monorail transit and combining the design requirements for the manufacturing accuracy of steel bridge piers. The difficulties in the manufacturing process of monorail steel bridge piers are analyzed, and the manufacturing schemes for the steel cap beams are compared and selected. Moreover, the manufacturing process and accuracy control methods of suspended monorail steel bridge piers are systematically expounded. [Result & Conclusion] Through the actual manufacturing of steel bridge piers and the on-site erection and installation of track beams, the distance between the lug plates of the steel cap beams (0-2 mm) and the distance from the cantilever center to the column central line (-2-2 mm) can be effectively controlled. After the overall assembly and formation of the steel bridge piers, the distance error between the line connecting the positioning point of the left cap beam pin axis to the center point at the steel column bottom, and the line connecting the positioning point of the right cap beam pin axis to the center point at the steel column bottom is ≤3 mm, and the elevation error between the center of the lug plate and the center of the column is ≤2 mm, meeting the requirements for the overall assembly and production of steel bridge piers, and realizing the control over the manufacturing accuracy of steel bridge piers.

SHILAP Revista de lepidopterología
China Railway Construction Machinery Research & Design Institute (CN)
Openalex Percentile: Top 57%
Structural Engineering and Vibration Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.