[Objective] The construction of a new shield-tunneling tunnel under-passing the existing tunnel can induce the latter′s settlement and deformation. Therefore, it is necessary to study the impact of construction factors on the settlement of the existing tunnel during the shield under-passing process. [Method] Taking the project of Guangzhou Metro Line 22 under-passing Line 3 as an example, multiple groups of numerical model are established based on Midas/GTS NX software. The influence rules of double-line shield tunneling under-passing on the existing tunnel settlement under the influence of two construction factors,soil chamber pressure and grouting pressure,are analyzed. Curve fitting is carried out according to the maximum settlement values of the tunnel corresponding to different soil chamber pressures and grouting pressures. Based on the settlement correction formula of the existing tunnel considering the influence of tunnel burial depth, a prediction formula for the settlement of the existing tunnel caused by double-line shield tunneling under-passing is proposed, which is applicable to Guangzhou area and considering construction factors. [Result & Conclusion] Within a reasonable range, the settlement value of the existing tunnel is negatively correlated with the soil chamber pressure and the grouting pressure. The settlement fitting curve functions of different soil chamber pressures and grouting pressures are capable to predict the settlement of the existing tunnel under the change of multiple construction factor levels. The lower limit of the soil chamber pressure in the under-passing section is 0.236 MPa, and that of the grouting pressure is 0.267 MPa. During the shield tunneling closely under-passing, construction supervision and protection should be strengthened. Appropriate grouting pressure and soil chamber pressure can reduce the disturbance impact on the existing tunnel.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-05-01
DOI
https://doi.org/10.16037/j.1007-869x.2025.05.025
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of Shield Under-Passing on Existing Tunnel Settlement Considering Construction Factors

SHILAP Revista de lepidopterología
Civil and Geotechnical Engineering Research
article

Impact of Shield Under-Passing on Existing Tunnel Settlement Considering Construction Factors

article en

Abstract

[Objective] The construction of a new shield-tunneling tunnel under-passing the existing tunnel can induce the latter′s settlement and deformation. Therefore, it is necessary to study the impact of construction factors on the settlement of the existing tunnel during the shield under-passing process. [Method] Taking the project of Guangzhou Metro Line 22 under-passing Line 3 as an example, multiple groups of numerical model are established based on Midas/GTS NX software. The influence rules of double-line shield tunneling under-passing on the existing tunnel settlement under the influence of two construction factors,soil chamber pressure and grouting pressure,are analyzed. Curve fitting is carried out according to the maximum settlement values of the tunnel corresponding to different soil chamber pressures and grouting pressures. Based on the settlement correction formula of the existing tunnel considering the influence of tunnel burial depth, a prediction formula for the settlement of the existing tunnel caused by double-line shield tunneling under-passing is proposed, which is applicable to Guangzhou area and considering construction factors. [Result & Conclusion] Within a reasonable range, the settlement value of the existing tunnel is negatively correlated with the soil chamber pressure and the grouting pressure. The settlement fitting curve functions of different soil chamber pressures and grouting pressures are capable to predict the settlement of the existing tunnel under the change of multiple construction factor levels. The lower limit of the soil chamber pressure in the under-passing section is 0.236 MPa, and that of the grouting pressure is 0.267 MPa. During the shield tunneling closely under-passing, construction supervision and protection should be strengthened. Appropriate grouting pressure and soil chamber pressure can reduce the disturbance impact on the existing tunnel.

SHILAP Revista de lepidopterología
Dalian University (CN)
Sustainable cities and communities
Openalex Percentile: Top 38%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Impact of Shield Under-Passing on Existing Tunnel Settlement Considering Construction Factors · SHILAP Revista de lepidopterología (2025) | TGRS Research Map | TGRS