Supplementary material.
<p>Additional detail on the underlying dynamic transmission model (S1), cost-effectiveness parameter estimates (S2), a breakdown of the results (S3), and results from additional scenario analysis (S4).</p> <p>(PDF)</p>
Publication Details
- Journal
- Figshare
- Published
- 2024-09-30
- DOI
- https://doi.org/10.1371/journal.pone.0294091.s001
- Primary Topic
- Power System Reliability and Maintenance
- Type
- article
- Field-Weighted Citation Impact
- 0.00