Optimizing nitrogen removal in vertical-flow constructed wetland: Effect of glucose addition and aeration duration

【Objective】Constructed wetlands are an effective technique for removing various organic and inorganic pollutants from wastewater. This study investigates the impact of glucose addition and intermittent aeration duration on nitrogen removal efficiency in vertical-flow constructed wetlands (VSFCWs) filled with substrates of varying particle sizes.【Method】The experiment was conducted in two phases. In the first phase, VSFCWs were tested with three glucose addition levels (10, 20, and 30 g) and five substrate types: fine particles (2 to 4 mm), medium particles, coarse particles, positive gradation, and negative gradation. Nitrogen removal efficiency was assessed for each treatment. In the second phase, the optimal combination of glucose addition and substrate type from the first phase was used to evaluate the effect of aeration durations ranging from 0 to 8 hours on nitrogen removal.【Result】When the glucose addition was the same, the VSFCWs filled with fine-grained matrix by particles with diameter of 2 to 4 mm was most effective in removing nitrogen. When the particle sizes were the same, adding 10 g of glucose was most effective in removing nitrogen. VSFCWs filled with matrix of positive and negative gradation reduced matrix porosity; VSFCW filled with the fine particle size gradation combined with a 10 g of glucose addition was most effective in nitrogen removal, with the total nitrogen removal rate reaching approximately 50%. The optimal aeration duration was 4 h, with its associated total nitrogen removal rate reaching 86.9%.【Conclusion】The most efficient nitrogen removal in the VSFCWs was achieved by using fine-sized zeolite substrate, 10 g of glucose addition, and a 4-hour aeration duration. These findings provide a reference for designing and operating constructed wetlands for enhancing nitrogen removal efficiency.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-01-01
DOI
https://doi.org/10.13522/j.cnki.ggps.2024222
Primary Topic
Constructed Wetlands for Wastewater Treatment
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing nitrogen removal in vertical-flow constructed wetland: Effect of glucose addition and aeration duration

SHILAP Revista de lepidopterología
Constructed Wetlands for Wastewater Treatment
article

Optimizing nitrogen removal in vertical-flow constructed wetland: Effect of glucose addition and aeration duration

article en

Abstract

【Objective】Constructed wetlands are an effective technique for removing various organic and inorganic pollutants from wastewater. This study investigates the impact of glucose addition and intermittent aeration duration on nitrogen removal efficiency in vertical-flow constructed wetlands (VSFCWs) filled with substrates of varying particle sizes.【Method】The experiment was conducted in two phases. In the first phase, VSFCWs were tested with three glucose addition levels (10, 20, and 30 g) and five substrate types: fine particles (2 to 4 mm), medium particles, coarse particles, positive gradation, and negative gradation. Nitrogen removal efficiency was assessed for each treatment. In the second phase, the optimal combination of glucose addition and substrate type from the first phase was used to evaluate the effect of aeration durations ranging from 0 to 8 hours on nitrogen removal.【Result】When the glucose addition was the same, the VSFCWs filled with fine-grained matrix by particles with diameter of 2 to 4 mm was most effective in removing nitrogen. When the particle sizes were the same, adding 10 g of glucose was most effective in removing nitrogen. VSFCWs filled with matrix of positive and negative gradation reduced matrix porosity; VSFCW filled with the fine particle size gradation combined with a 10 g of glucose addition was most effective in nitrogen removal, with the total nitrogen removal rate reaching approximately 50%. The optimal aeration duration was 4 h, with its associated total nitrogen removal rate reaching 86.9%.【Conclusion】The most efficient nitrogen removal in the VSFCWs was achieved by using fine-sized zeolite substrate, 10 g of glucose addition, and a 4-hour aeration duration. These findings provide a reference for designing and operating constructed wetlands for enhancing nitrogen removal efficiency.

SHILAP Revista de lepidopterología
China University of Geosciences (Beijing) (CN)
Clean water and sanitation
Openalex Percentile: Top 51%
Constructed Wetlands for Wastewater Treatment
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimizing nitrogen removal in vertical-flow constructed wetland: Effect of glucose addition and aeration duration · SHILAP Revista de lepidopterología (2025) | TGRS Research Map | TGRS