Optimal Operation of Integrated Energy System Considering Flexible Emergency Resource Coordination Under Ice Disaster

Extreme ice disasters can cause frequent blackouts and shutdowns. Flexible Emergency Resources (FERs) play a complementary role. Coordinating multiple FERs to participate in scheduling facilitates system recovery. This study proposes an integrated energy system operation framework that considers FER coordination during ice disasters. In the pre-disaster prevention stage, a robust optimization model is constructed to solve the FER pre-scheduling scheme. In the post-disaster resistance and recovery phases, a two-layer optimization model of an integrated energy system considering the FER is established. Emergency repair of the upper line and load reduction of the lower node are transmitted in real-time to realize rapid emergency repair. Simultaneously, the system scheduling is optimized by the mobile energy storage team to reduce the comprehensive load reduction rate of the system and improve flexibility. The case study shows that the proposed framework can effectively reduce the comprehensive load reduction rate by 32.16 % and improve the ability of the system to resist disasters.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-03-01
DOI
https://doi.org/10.12204/j.issn.1000-7229.2025.03.003
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimal Operation of Integrated Energy System Considering Flexible Emergency Resource Coordination Under Ice Disaster

SHILAP Revista de lepidopterología
Integrated Energy Systems Optimization
article

Optimal Operation of Integrated Energy System Considering Flexible Emergency Resource Coordination Under Ice Disaster

article en

Abstract

Extreme ice disasters can cause frequent blackouts and shutdowns. Flexible Emergency Resources (FERs) play a complementary role. Coordinating multiple FERs to participate in scheduling facilitates system recovery. This study proposes an integrated energy system operation framework that considers FER coordination during ice disasters. In the pre-disaster prevention stage, a robust optimization model is constructed to solve the FER pre-scheduling scheme. In the post-disaster resistance and recovery phases, a two-layer optimization model of an integrated energy system considering the FER is established. Emergency repair of the upper line and load reduction of the lower node are transmitted in real-time to realize rapid emergency repair. Simultaneously, the system scheduling is optimized by the mobile energy storage team to reduce the comprehensive load reduction rate of the system and improve flexibility. The case study shows that the proposed framework can effectively reduce the comprehensive load reduction rate by 32.16 % and improve the ability of the system to resist disasters.

SHILAP Revista de lepidopterología
State Grid Corporation of China (China) (CN), Shanghai Electric (China) (CN), Jilin Electric Power Research Institute (China) (CN)
Openalex Percentile: Top 58%
Integrated Energy Systems Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.