Experience in implementing the algorithm for emergency control system of unloading in case of overload in terms of power based on synchrophasor angle
\nAn algorithm for automatic unloading during a power overload is described. It is based on measurement of the phase angle between voltages on the Tyumen - Ural power transmission line, which is determined by information from phasor measurement units. The algorithm is implemented in a specialized controller K-100.\n
Publication Details
- Journal
- Springer Link (Chiba Institute of Technology)
- Published
- 2024-11-06
- DOI
- https://doi.org/10.1051/e3sconf/202458401039/pdf
- Primary Topic
- Electric Power Systems and Control
- Type
- article
- Field-Weighted Citation Impact
- 0.00