In preparation for construction of a parallel runway at the Calgary International Airport in the spring of 2011, concrete pavement had to be constructed to realign Gates A1–A10. Concrete mixes were developed for central batch production for both paver and hand placement methods. In addition, winter conditions required concrete delivery from a local concrete ready-mix supplier. The construction schedule required the paved sections to be open to aircraft traffic three weeks after pavement construction. A maturity method was developed to estimate early age compressive/flexural strength of the concrete pavement. This paper presents the process utilized in developing the concrete mix design to meet the project requirements for Cement Stabilized Base (CSB) and the Portland cement concrete mix, the development of the plant mix, and the construction methodology. Additional challenges with pavement construction in winter conditions are highlighted, including CSB and concrete placement, curing conditions, control joint construction, and instrumentation for maturity of concrete determination. The verification process for final acceptance of the product is described, including durability testing and pavement design review. This project demonstrated that concrete pavement can be constructed under accelerated schedule and during adverse weather conditions with the quality of the pavement not compromised and the construction schedule successfully managed.

Authors

Publication Details

Journal
Proceedings of the International Conference on Concrete Pavements
Published
2025-01-22
DOI
https://doi.org/10.33593/iccp.v10i1.438
Primary Topic
Concrete and Cement Materials Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Challenges with Construction of Portland Cement Concrete Pavement at Calgary International Airport

Curtis Bouteiller, Ward L. Johnson, B Czarnecki
Proceedings of the International Conference on Concrete Pavements
Concrete and Cement Materials Research
article

Challenges with Construction of Portland Cement Concrete Pavement at Calgary International Airport

Curtis Bouteiller, Ward L. Johnson, B Czarnecki
article en

Abstract

In preparation for construction of a parallel runway at the Calgary International Airport in the spring of 2011, concrete pavement had to be constructed to realign Gates A1–A10. Concrete mixes were developed for central batch production for both paver and hand placement methods. In addition, winter conditions required concrete delivery from a local concrete ready-mix supplier. The construction schedule required the paved sections to be open to aircraft traffic three weeks after pavement construction. A maturity method was developed to estimate early age compressive/flexural strength of the concrete pavement. This paper presents the process utilized in developing the concrete mix design to meet the project requirements for Cement Stabilized Base (CSB) and the Portland cement concrete mix, the development of the plant mix, and the construction methodology. Additional challenges with pavement construction in winter conditions are highlighted, including CSB and concrete placement, curing conditions, control joint construction, and instrumentation for maturity of concrete determination. The verification process for final acceptance of the product is described, including durability testing and pavement design review. This project demonstrated that concrete pavement can be constructed under accelerated schedule and during adverse weather conditions with the quality of the pavement not compromised and the construction schedule successfully managed.

Proceedings of the International Conference on Concrete Pavements
Sustainable cities and communities
Openalex Percentile: Top 100%
Concrete and Cement Materials Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Challenges with Construction of Portland Cement Concrete Pavement at Calgary International Airport — Curtis Bouteiller, Ward L. Johnson, et al. · Proceedings of the International Conference on Concrete Pavements (2025) | TGRS Research Map | TGRS