Experiences Resulted from Construction of Two-way Post-Tensioned Concrete Pavement

In this paper there are presented results of experimental investigation and preliminary conclusions dealing with the efficiency of early posttensioning concrete pavement. Short section of concrete pavement 3.5 by 20.0 m (11.5 by 65.6 ft) thickness 0.23 m (9 in.) was posttensioned in longitudinal and transverse direction. The total prestressing was realized in one stage after 48 hours from concreting. The unbonded tendons 75 mm (0.6 in.) were tensioned with 200 kN (45 kip) force in both direction. The aim of investigation was the experimental evaluation of temperature and concrete strains distributions during the process of pavement concrete hardening for different environmental condition for period of 13 months. Values of prestressing force distribution were monitoring for 26 days period. For this reason, unbonded tendons were equipped with vibrating wire force transducer Geokon type. The concrete strains as well as temperature changes were recorded with Geokon vibrating wire sensors localized at three levels of the slab thickness in four vertical cross-section.

Authors

Publication Details

Journal
Proceedings of the International Conference on Concrete Pavements
Published
2025-01-22
DOI
https://doi.org/10.33593/iccp.v10i1.375
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Experiences Resulted from Construction of Two-way Post-Tensioned Concrete Pavement

Rafał Szydłowski, Andrzej Seruga
Proceedings of the International Conference on Concrete Pavements
Geotechnical Engineering and Soil Stabilization
article

Experiences Resulted from Construction of Two-way Post-Tensioned Concrete Pavement

Rafał Szydłowski, Andrzej Seruga
article en

Abstract

In this paper there are presented results of experimental investigation and preliminary conclusions dealing with the efficiency of early posttensioning concrete pavement. Short section of concrete pavement 3.5 by 20.0 m (11.5 by 65.6 ft) thickness 0.23 m (9 in.) was posttensioned in longitudinal and transverse direction. The total prestressing was realized in one stage after 48 hours from concreting. The unbonded tendons 75 mm (0.6 in.) were tensioned with 200 kN (45 kip) force in both direction. The aim of investigation was the experimental evaluation of temperature and concrete strains distributions during the process of pavement concrete hardening for different environmental condition for period of 13 months. Values of prestressing force distribution were monitoring for 26 days period. For this reason, unbonded tendons were equipped with vibrating wire force transducer Geokon type. The concrete strains as well as temperature changes were recorded with Geokon vibrating wire sensors localized at three levels of the slab thickness in four vertical cross-section.

Proceedings of the International Conference on Concrete Pavements
Sustainable cities and communities
Openalex Percentile: Top 100%
Geotechnical Engineering and Soil Stabilization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Experiences Resulted from Construction of Two-way Post-Tensioned Concrete Pavement — Rafał Szydłowski, Andrzej Seruga · Proceedings of the International Conference on Concrete Pavements (2025) | TGRS Research Map | TGRS