Quebec Contractor Experience with Unbonded Concrete Overlays

With Quebec’s aging road network and increasing truck traffic, rehabilitation of the province’s main highways is an important issue for Quebec’s transportation ministry (MTQ). The use of a concrete overlay is an economical and environmentally sustainable solution, for both old concrete and old asphalt roads. This paper describes two concrete overlay projects for the rehabilitation of two sections of Highway 40 in the Greater Montreal Area: one over concrete pavement and one over asphalt pavement. The very first concrete overlay done for MTQ was applied on a 5 km stretch of 40-year-old concrete pavement in Vaudreuil. The project included the design, construction, and maintenance of the pavement for 10 years. The second unbonded overlay—and the first “whitetopping” in Quebec--was conducted in 2010. A 7 km portion of Highway A40 in L’Assomption with recurrent rutting problem was resurfaced with a concrete pavement.

Authors

Publication Details

Journal
Proceedings of the International Conference on Concrete Pavements
Published
2025-01-22
DOI
https://doi.org/10.33593/iccp.v10i1.445
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Quebec Contractor Experience with Unbonded Concrete Overlays

Jean-Pierre Turgeon, Pierre-Louis Maillard
Proceedings of the International Conference on Concrete Pavements
BIM and Construction Integration
article

Quebec Contractor Experience with Unbonded Concrete Overlays

Jean-Pierre Turgeon, Pierre-Louis Maillard
article en

Abstract

With Quebec’s aging road network and increasing truck traffic, rehabilitation of the province’s main highways is an important issue for Quebec’s transportation ministry (MTQ). The use of a concrete overlay is an economical and environmentally sustainable solution, for both old concrete and old asphalt roads. This paper describes two concrete overlay projects for the rehabilitation of two sections of Highway 40 in the Greater Montreal Area: one over concrete pavement and one over asphalt pavement. The very first concrete overlay done for MTQ was applied on a 5 km stretch of 40-year-old concrete pavement in Vaudreuil. The project included the design, construction, and maintenance of the pavement for 10 years. The second unbonded overlay—and the first “whitetopping” in Quebec--was conducted in 2010. A 7 km portion of Highway A40 in L’Assomption with recurrent rutting problem was resurfaced with a concrete pavement.

Proceedings of the International Conference on Concrete Pavements
Openalex Percentile: Top 100%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.