An innovative two-stage method for balancing time, cost, quality, and additional objectives in multi-mode resource-constrained project scheduling: A case study of a food product packaging production line project

This paper presents a novel two-stage approach for optimizing the scheduling of multi-objective construction projects, validated through a real-world case study of a food product packaging production line. Beyond the conventional objectives of time, cost, and quality, five additional factors—risk, scope creep, environmental impacts, stakeholder satisfaction, and safety—are quantitatively incorporated based on expert judgment and normalized performance ratings. In the first stage, a TOPSIS-based similarity index is calculated for each execution mode of the project activities, aggregating the additional objectives into a single comparable criterion derived from the weighted expert assessments. In the second stage, a four-objective optimization model is formulated to balance project makespan, cost, quality, and the similarity index. Integrating the similarity index ensures simultaneous consideration of both traditional and supplementary objectives. The multi-mode resource-constrained project scheduling problem (MRCPSP) is solved on small instances using the epsilon-constraint method, and for medium- and large-scale problems, two metaheuristics—NSGA-II and MOPSO—are employed. Computational results and sensitivity analyses conducted on the case study demonstrate the model’s capability to produce a diverse set of high-quality Pareto-optimal solutions within reasonable computational timeframes. The proposed framework’s flexibility makes it suitable for projects with varying objective priorities, offering a comprehensive and practical decision-support tool for project managers aiming for more balanced and precise scheduling decisions.

Authors

Publication Details

Journal
Results in Control and Optimization
Published
2025-12-20
DOI
https://doi.org/10.1016/j.rico.2025.100649
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An innovative two-stage method for balancing time, cost, quality, and additional objectives in multi-mode resource-constrained project scheduling: A case study of a food product packaging production line project

M.H.M.A. Jahromi, Hossein edrisi, Narges Noruzi
Results in Control and Optimization
Resource-Constrained Project Scheduling
article

An innovative two-stage method for balancing time, cost, quality, and additional objectives in multi-mode resource-constrained project scheduling: A case study of a food product packaging production line project

M.H.M.A. Jahromi, Hossein edrisi, Narges Noruzi
article en

Abstract

This paper presents a novel two-stage approach for optimizing the scheduling of multi-objective construction projects, validated through a real-world case study of a food product packaging production line. Beyond the conventional objectives of time, cost, and quality, five additional factors—risk, scope creep, environmental impacts, stakeholder satisfaction, and safety—are quantitatively incorporated based on expert judgment and normalized performance ratings. In the first stage, a TOPSIS-based similarity index is calculated for each execution mode of the project activities, aggregating the additional objectives into a single comparable criterion derived from the weighted expert assessments. In the second stage, a four-objective optimization model is formulated to balance project makespan, cost, quality, and the similarity index. Integrating the similarity index ensures simultaneous consideration of both traditional and supplementary objectives. The multi-mode resource-constrained project scheduling problem (MRCPSP) is solved on small instances using the epsilon-constraint method, and for medium- and large-scale problems, two metaheuristics—NSGA-II and MOPSO—are employed. Computational results and sensitivity analyses conducted on the case study demonstrate the model’s capability to produce a diverse set of high-quality Pareto-optimal solutions within reasonable computational timeframes. The proposed framework’s flexibility makes it suitable for projects with varying objective priorities, offering a comprehensive and practical decision-support tool for project managers aiming for more balanced and precise scheduling decisions.

Results in Control and OptimizationVol. 22
Openalex Percentile: Top 54%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.