Iterated Greedy Algorithm with Problem-specific Knowledge for Multi-objective No-wait Flowshop Scheduling Problem

Institutions

Publication Details

Journal
Journal of Mechanical Engineering
Published
2025-01-01
DOI
https://doi.org/10.3901/jme.2025.04.344
Citations
2
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
4.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Iterated Greedy Algorithm with Problem-specific Knowledge for Multi-objective No-wait Flowshop Scheduling Problem

2 citations
Journal of Mechanical Engineering
Resource-Constrained Project Scheduling
4.21
article

Iterated Greedy Algorithm with Problem-specific Knowledge for Multi-objective No-wait Flowshop Scheduling Problem

article en
2 citations

Abstract

No abstract available for this paper.
Journal of Mechanical EngineeringVol. 61(4)
Shanghai University (CN), Shanghai University of Engineering Science (CN), Shanghai Maritime University (CN)
Openalex Percentile: Top 5%
Resource-Constrained Project Scheduling
4.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Iterated Greedy Algorithm with Problem-specific Knowledge for Multi-objective No-wait Flowshop Scheduling Problem · Journal of Mechanical Engineering (2025) | TGRS Research Map | TGRS