Risk assessment of the early containment overpressurization for HPR1000 nuclear power plant

This paper presents a systematic evaluation of the risk of early containment overpressurization for the HPR1000 nuclear power plant. Probabilistic analysis and nonlinear finite element numerical simulation methods are first applied to establish the containment failure probability curve. On the basis of two representative accident scenarios, namely the Large Break Loss-of-Coolant Accident (LLOCA) and the Main Steam Line Break (MSLB), pressure variations within the containment during the initial stages of the accidents are examined in detail through deterministic analysis methods. The results are subsequently compared with the containment failure probability curve to evaluate the risk of early containment overpressurization. The analysis indicates that within 24 hours, the probability of containment failure corresponding to the peak pressure is negligible. This finding demonstrates that the containment design of HPR1000 exhibits high reliability even under severe accident conditions, and the likelihood of early overpressure failure caused by steam release can be disregarded. The outcomes of this study provide valuable reference for the safe operation of HPR1000 and the safety design of future nuclear power plants.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-12-01
DOI
https://doi.org/10.1049/icp.2025.3432
Primary Topic
Nuclear Engineering Thermal-Hydraulics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk assessment of the early containment overpressurization for HPR1000 nuclear power plant

Wang Gaopeng, Xinli Yu, Wei Wei, Jing Liu et al.
IET conference proceedings.
Nuclear Engineering Thermal-Hydraulics
article

Risk assessment of the early containment overpressurization for HPR1000 nuclear power plant

Wang Gaopeng, Xinli Yu, Wei Wei, Jing Liu, Xueyao Shi, Yu Yun, Guo Chenlong
article en

Abstract

This paper presents a systematic evaluation of the risk of early containment overpressurization for the HPR1000 nuclear power plant. Probabilistic analysis and nonlinear finite element numerical simulation methods are first applied to establish the containment failure probability curve. On the basis of two representative accident scenarios, namely the Large Break Loss-of-Coolant Accident (LLOCA) and the Main Steam Line Break (MSLB), pressure variations within the containment during the initial stages of the accidents are examined in detail through deterministic analysis methods. The results are subsequently compared with the containment failure probability curve to evaluate the risk of early containment overpressurization. The analysis indicates that within 24 hours, the probability of containment failure corresponding to the peak pressure is negligible. This finding demonstrates that the containment design of HPR1000 exhibits high reliability even under severe accident conditions, and the likelihood of early overpressure failure caused by steam release can be disregarded. The outcomes of this study provide valuable reference for the safe operation of HPR1000 and the safety design of future nuclear power plants.

IET conference proceedings.Vol. 2025(35)
China General Nuclear Power Corporation (China) (CN), Tsinghua University (CN)
Openalex Percentile: Top 48%
Nuclear Engineering Thermal-Hydraulics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.