Heavy Truck Gap Acceptance and Critical Gap Length Evaluation at Congested Roundabouts

Heavy trucks are believed to experience increased delays when entering congested roundabouts due to their increased size and more restrictive operating characteristics as compared to passenger cars. The present study evaluated 164 h of video data to transcribe 2,626 heavy truck movements at single-lane roundabouts across Oregon and Washington. Gap acceptance and gap rejection timings were evaluated to quantify heavy truck accessibility when entering congested roundabouts. Further, a variety of heavy truck classifications were observed and evaluated individually, with the most common being the WB-40, WB-50, WB-62, WB-67, WB-67D, and WB-92D. Within each of these classifications, gap acceptance behavior differed. Average rejected gap lengths were 3.84 s, while average accepted gap lengths were 8.69 s, indicating heavy trucks often accepted gaps that were over two times larger than the prior gaps. Critical gap length assessment was carried out following Raff’s method on an individual-classification basis to compare critical gaps across heavy truck classifications. Critical gap lengths for heavy trucks ranged from 5.4 to 6.4 s, approximately two to three times larger than that of passenger car critical gap values of 2.2 and 2.6 s documented in prior research. Additionally, heavy truck critical gap requirements were found to increase proportionately with the heavy truck size. The WB-40 was the smallest heavy truck assessed and was found to have a critical gap of 5.4 s. Conversely, the WB-92D was the largest heavy truck and was associated with a critical gap of 6.4 s. These findings indicate that roundabout locations featuring high heavy truck volumes may need additional considerations due to the operational restrictions of these larger vehicles, and that the assessment of roundabout implementation should include analysis of the vehicle classifications using these facilities to most optimally design for the current and future demand.

Authors

Institutions

Publication Details

Journal
Journal of Transportation Engineering Part A Systems
Published
2025-12-18
DOI
https://doi.org/10.1061/jtepbs.teeng-9039
Primary Topic
Traffic control and management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Heavy Truck Gap Acceptance and Critical Gap Length Evaluation at Congested Roundabouts

Logan Scott-Deeter, David Hurwitz, Salvador Hernández, Hisham Jashami et al.
Journal of Transportation Engineering Part A Systems
Traffic control and management
article

Heavy Truck Gap Acceptance and Critical Gap Length Evaluation at Congested Roundabouts

Logan Scott-Deeter, David Hurwitz, Salvador Hernández, Hisham Jashami, James Umphress
article en

Abstract

Heavy trucks are believed to experience increased delays when entering congested roundabouts due to their increased size and more restrictive operating characteristics as compared to passenger cars. The present study evaluated 164 h of video data to transcribe 2,626 heavy truck movements at single-lane roundabouts across Oregon and Washington. Gap acceptance and gap rejection timings were evaluated to quantify heavy truck accessibility when entering congested roundabouts. Further, a variety of heavy truck classifications were observed and evaluated individually, with the most common being the WB-40, WB-50, WB-62, WB-67, WB-67D, and WB-92D. Within each of these classifications, gap acceptance behavior differed. Average rejected gap lengths were 3.84 s, while average accepted gap lengths were 8.69 s, indicating heavy trucks often accepted gaps that were over two times larger than the prior gaps. Critical gap length assessment was carried out following Raff’s method on an individual-classification basis to compare critical gaps across heavy truck classifications. Critical gap lengths for heavy trucks ranged from 5.4 to 6.4 s, approximately two to three times larger than that of passenger car critical gap values of 2.2 and 2.6 s documented in prior research. Additionally, heavy truck critical gap requirements were found to increase proportionately with the heavy truck size. The WB-40 was the smallest heavy truck assessed and was found to have a critical gap of 5.4 s. Conversely, the WB-92D was the largest heavy truck and was associated with a critical gap of 6.4 s. These findings indicate that roundabout locations featuring high heavy truck volumes may need additional considerations due to the operational restrictions of these larger vehicles, and that the assessment of roundabout implementation should include analysis of the vehicle classifications using these facilities to most optimally design for the current and future demand.

Journal of Transportation Engineering Part A SystemsVol. 152(3)
Oregon State University (US), Engineering Associates (United States) (US)
Openalex Percentile: Top 50%
Traffic control and management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.