Optimization of Emergency Evacuation Paths for Personnel in Tailings Dam Failure Disasters

The tailings dam failure poses a significant threat to the life and property security of downstream residents, with emergency evacuation serving as a crucial measure to mitigate disaster losses. Herein, a multiobjective evacuation path model is developed to address the key issue of emergency evacuation path planning following a tailings dam failure. The model is based on multiobjective evacuation mathematical theory, with the goals of minimizing evacuation time and reducing personnel risk, while considering the downstream road network structure and the inundation area of the dam break as constraints. To further solve the multisource point problem within the model, a Dijkstra’s algorithm with high compatibility to GIS road networks is employed. Additionally, the algorithm is improved using a circular search range limitation method, significantly enhancing the solution efficiency of the evacuation path model. An evacuation route‐planning system for tailings‐dam breach emergencies was developed using the ArcGIS Engine and Visual Studio, with data stored and managed in a geodatabase. Benchmark results show that, compared with the standard Dijkstra’s algorithm, the improved algorithm reduced the number of nodes and arcs traversed by 168 and 106, respectively, and achieved a 49.6% speedup (runtime reduced from 876.47 to 441.23 ms). Then, the system is successfully applied to the emergency evacuation of downstream residents following the tailings dam failure at the Tongshankou tailings dam in Hubei Province. Dam break simulation for Tongshankou indicated four downstream villages were threatened, with peak depths of ~ 4.5–7.5 m and flow velocities > 6 m/s. Computed total evacuation times were 4.09 min (Chengongjin village), 7.92 min (Chentingjie village), 10.21 min (Chenxizhen village), and 9.76 min (Wangjia village), all shorter than the corresponding inundation arrival times of 6.35 min, 10.91 min, 12.24 min, and 17.44 min, respectively, yielding positive safety margins ( Δt = 2.03 to 7.68 min).

Authors

Institutions

Publication Details

Journal
Advances in Civil Engineering
Published
2025-01-01
DOI
https://doi.org/10.1155/adce/2563491
Primary Topic
Evacuation and Crowd Dynamics
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Emergency Evacuation Paths for Personnel in Tailings Dam Failure Disasters

Shu Zeng, Y Zhang, Hongyan Zhou, Shaohua Hu et al.
Advances in Civil Engineering
Evacuation and Crowd Dynamics
article

Optimization of Emergency Evacuation Paths for Personnel in Tailings Dam Failure Disasters

Shu Zeng, Y Zhang, Hongyan Zhou, Shaohua Hu, Meixian Qu
article en

Abstract

The tailings dam failure poses a significant threat to the life and property security of downstream residents, with emergency evacuation serving as a crucial measure to mitigate disaster losses. Herein, a multiobjective evacuation path model is developed to address the key issue of emergency evacuation path planning following a tailings dam failure. The model is based on multiobjective evacuation mathematical theory, with the goals of minimizing evacuation time and reducing personnel risk, while considering the downstream road network structure and the inundation area of the dam break as constraints. To further solve the multisource point problem within the model, a Dijkstra’s algorithm with high compatibility to GIS road networks is employed. Additionally, the algorithm is improved using a circular search range limitation method, significantly enhancing the solution efficiency of the evacuation path model. An evacuation route‐planning system for tailings‐dam breach emergencies was developed using the ArcGIS Engine and Visual Studio, with data stored and managed in a geodatabase. Benchmark results show that, compared with the standard Dijkstra’s algorithm, the improved algorithm reduced the number of nodes and arcs traversed by 168 and 106, respectively, and achieved a 49.6% speedup (runtime reduced from 876.47 to 441.23 ms). Then, the system is successfully applied to the emergency evacuation of downstream residents following the tailings dam failure at the Tongshankou tailings dam in Hubei Province. Dam break simulation for Tongshankou indicated four downstream villages were threatened, with peak depths of ~ 4.5–7.5 m and flow velocities > 6 m/s. Computed total evacuation times were 4.09 min (Chengongjin village), 7.92 min (Chentingjie village), 10.21 min (Chenxizhen village), and 9.76 min (Wangjia village), all shorter than the corresponding inundation arrival times of 6.35 min, 10.91 min, 12.24 min, and 17.44 min, respectively, yielding positive safety margins ( Δt = 2.03 to 7.68 min).

Advances in Civil EngineeringVol. 2025(1)
Wuhan University of Technology (CN), Wuhan University of Science and Technology (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 50%
Evacuation and Crowd Dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.