Value Engineering on the Mosque Construction Project in the South Kalimantan Provincial Government Office Area

The analysis performed to optimize costs will generate alternatives that will be compared with the initial design, and this analysis can be called value engineering analysis. This research aims to assess the percentage of cost savings that can be obtained by applying the value engineering technique, as well as to evaluate the life cycle cost of various selected material alternatives. The Mosque Construction Project in the South Kalimantan Provincial Government Office Area was chosen as the research object because of cost inefficiency in the architectural work, with a total cost of Rp. 26,857,215,362.63 out of the total project cost of Rp. 55,600,738,764.97. The architectural work will be corrected using Pareto diagram analysis through the value engineering phases, namely the information phase, speculation phase, and analysis phase. From the value engineering analysis results, a savings of 3.65% of the total project value was obtained. The life cycle cost analysis shows that the selected material has a lower life cycle cost value compared to the initially planned material. In addition, the work execution time with the selected material can complete the work on site more quickly

Authors

Institutions

Publication Details

Journal
THE SPIRIT OF SOCIETY JOURNAL
Published
2025-11-20
DOI
https://doi.org/10.29138/scj.v9i1.3473
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Value Engineering on the Mosque Construction Project in the South Kalimantan Provincial Government Office Area

Budi Witjaksana, Hanie Teki Tjendani, Yan Rahmatullah
THE SPIRIT OF SOCIETY JOURNAL
Value Engineering and Management
article

Value Engineering on the Mosque Construction Project in the South Kalimantan Provincial Government Office Area

Budi Witjaksana, Hanie Teki Tjendani, Yan Rahmatullah
article en

Abstract

The analysis performed to optimize costs will generate alternatives that will be compared with the initial design, and this analysis can be called value engineering analysis. This research aims to assess the percentage of cost savings that can be obtained by applying the value engineering technique, as well as to evaluate the life cycle cost of various selected material alternatives. The Mosque Construction Project in the South Kalimantan Provincial Government Office Area was chosen as the research object because of cost inefficiency in the architectural work, with a total cost of Rp. 26,857,215,362.63 out of the total project cost of Rp. 55,600,738,764.97. The architectural work will be corrected using Pareto diagram analysis through the value engineering phases, namely the information phase, speculation phase, and analysis phase. From the value engineering analysis results, a savings of 3.65% of the total project value was obtained. The life cycle cost analysis shows that the selected material has a lower life cycle cost value compared to the initially planned material. In addition, the work execution time with the selected material can complete the work on site more quickly

THE SPIRIT OF SOCIETY JOURNALVol. 9(1)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 45%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.