Learning to Solve Resource-Constrained Project Scheduling Problems with Duration Uncertainty Using Graph Neural Networks

The Resource-Constrained Project Scheduling Problem (RCPSP) is a classical scheduling problem that has received significant attention due to of its numerous applications in industry. However, in practice, task durations are subject to uncertainty that must be considered in order to propose resilient scheduling. In this paper, we address the RCPSP variant with uncertain tasks duration (modeled using known probabilities) and aim to minimize the overall expected project duration. Our objective is to produce a baseline schedule that can be reused multiple times in an industrial setting regardless of the actual duration scenario. We leverage Graph Neural Networks in conjunction with Deep Reinforcement Learning (DRL) to develop an effective policy for task scheduling. This policy operates similarly to a priority dispatch rule and is paired with a Serial Schedule Generation Scheme to produce a schedule. Our empirical evaluation on standard benchmarks demonstrates the approach's superiority in terms of performance and its ability to generalize. The developed framework, Wheatley, is made publicly available online to facilitate further research and reproducibility.

Authors

Institutions

Publication Details

Published
2025-11-03
DOI
https://doi.org/10.1109/ictai66417.2025.00157
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Learning to Solve Resource-Constrained Project Scheduling Problems with Duration Uncertainty Using Graph Neural Networks

Guillaume Infantes, Stéphanie Roussel, Emmanuel Bénazéra, Antoine Jacquet
Resource-Constrained Project Scheduling
article

Learning to Solve Resource-Constrained Project Scheduling Problems with Duration Uncertainty Using Graph Neural Networks

Guillaume Infantes, Stéphanie Roussel, Emmanuel Bénazéra, Antoine Jacquet
article en

Abstract

The Resource-Constrained Project Scheduling Problem (RCPSP) is a classical scheduling problem that has received significant attention due to of its numerous applications in industry. However, in practice, task durations are subject to uncertainty that must be considered in order to propose resilient scheduling. In this paper, we address the RCPSP variant with uncertain tasks duration (modeled using known probabilities) and aim to minimize the overall expected project duration. Our objective is to produce a baseline schedule that can be reused multiple times in an industrial setting regardless of the actual duration scenario. We leverage Graph Neural Networks in conjunction with Deep Reinforcement Learning (DRL) to develop an effective policy for task scheduling. This policy operates similarly to a priority dispatch rule and is paired with a Serial Schedule Generation Scheme to produce a schedule. Our empirical evaluation on standard benchmarks demonstrates the approach's superiority in terms of performance and its ability to generalize. The developed framework, Wheatley, is made publicly available online to facilitate further research and reproducibility.

Toulouse Mathematics Institute (FR), Limagrain (France) (FR)
Openalex Percentile: Top 55%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Learning to Solve Resource-Constrained Project Scheduling Problems with Duration Uncertainty Using Graph Neural Networks — Guillaume Infantes, Stéphanie Roussel, et al. · (2025) | TGRS Research Map | TGRS