A Framework for Evaluating Uncertainty From Multiple Sources in Probable Maximum Precipitation Estimation by the Hershfield Method Using Imprecise Probability

Abstract Design flood corresponding to probable maximum precipitation (PMP) is often used in risk assessment of large hydraulic structures. PMP is widely estimated using the Hershfield method (HM) when reasonably long precipitation records are available, but other hydrometeorological data are unavailable/limited. Uncertainty in HM‐based PMP estimates can arise from multiple sources, but the literature lacks methodologies to identify significant contributors to the uncertainty and determine the overall uncertainty bounds. To address this research gap, a novel framework based on imprecise probability (IP) theory is proposed. It facilitates quantifying the overall uncertainty in PMP estimates arising from multiple sources and discerning contributions from individual sources and their combinations. Uncertainties analyzed include those due to (i) the sampling effect of precipitation observations, and (ii) 24 combinations of options for (a) defining a meaningful region/zone, (b) envelope curve space preparation, and (c) the curve construction. The effectiveness of the proposed framework in determining IP bounds of PMP estimates is illustrated through case studies on two major flood‐prone river basins (Mahanadi and Godavari) in India and the Brazos River basin in the United States. Results revealed that the highest contributor to the overall uncertainty in PMP estimates is the combined/interaction component of all four uncertainty sources for the Indian river basins and the statistical sampling effect for the United States basin. Whereas the least contribution to uncertainty is consistently from envelope curve construction. Options/guidelines are provided to reduce the uncertainty (interval between IP bounds) arising from different sources in PMP estimation with HM.

Authors

Institutions

Publication Details

Journal
Water Resources Research
Published
2025-12-01
DOI
https://doi.org/10.1029/2024wr038052
Primary Topic
Hydrology and Drought Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Framework for Evaluating Uncertainty From Multiple Sources in Probable Maximum Precipitation Estimation by the Hershfield Method Using Imprecise Probability

V. V. Srinivas, Jaya Bhatt
Water Resources Research
Hydrology and Drought Analysis
article

A Framework for Evaluating Uncertainty From Multiple Sources in Probable Maximum Precipitation Estimation by the Hershfield Method Using Imprecise Probability

V. V. Srinivas, Jaya Bhatt
article en

Abstract

Abstract Design flood corresponding to probable maximum precipitation (PMP) is often used in risk assessment of large hydraulic structures. PMP is widely estimated using the Hershfield method (HM) when reasonably long precipitation records are available, but other hydrometeorological data are unavailable/limited. Uncertainty in HM‐based PMP estimates can arise from multiple sources, but the literature lacks methodologies to identify significant contributors to the uncertainty and determine the overall uncertainty bounds. To address this research gap, a novel framework based on imprecise probability (IP) theory is proposed. It facilitates quantifying the overall uncertainty in PMP estimates arising from multiple sources and discerning contributions from individual sources and their combinations. Uncertainties analyzed include those due to (i) the sampling effect of precipitation observations, and (ii) 24 combinations of options for (a) defining a meaningful region/zone, (b) envelope curve space preparation, and (c) the curve construction. The effectiveness of the proposed framework in determining IP bounds of PMP estimates is illustrated through case studies on two major flood‐prone river basins (Mahanadi and Godavari) in India and the Brazos River basin in the United States. Results revealed that the highest contributor to the overall uncertainty in PMP estimates is the combined/interaction component of all four uncertainty sources for the Indian river basins and the statistical sampling effect for the United States basin. Whereas the least contribution to uncertainty is consistently from envelope curve construction. Options/guidelines are provided to reduce the uncertainty (interval between IP bounds) arising from different sources in PMP estimation with HM.

Water Resources ResearchVol. 61(12)
International Institute of Information Technology Bangalore (IN), Indian Institute of Science Bangalore (IN)
Openalex Percentile: Top 63%
Hydrology and Drought Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Framework for Evaluating Uncertainty From Multiple Sources in Probable Maximum Precipitation Estimation by the Hershfield Method Using Imprecise Probability — V. V. Srinivas, Jaya Bhatt · Water Resources Research (2025) | TGRS Research Map | TGRS